Mostrar el registro sencillo del ítem

dc.contributor.advisorMoreno García, Manueles-ES
dc.contributor.authorRuano Pérez, Rodrigoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2019-11-06T07:50:19Z
dc.date.available2019-11-06T07:50:19Z
dc.date.issued2020es_ES
dc.identifier.urihttp://hdl.handle.net/11531/42949
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractKazai es un pequeño poblado situado al Norte de Zimbabwe, a pocos kilómetros de la frontera con Mozambique. Antecedentes históricos y casi cuarenta años de dictadura reciente han provocado una de las más duras crisis económicas conocidas y han sumido a gran parte de la población en la pobreza y la lucha por el autoabastecimiento y la subsistencia. En colaboración con la ONG Child Future Africa y la Fundación Ingenieros ICAI, este trabajo perseguirá contribuir al desarrollo de Kazai mediante la implementación de una pequeña instalación hidroeléctrica. Esta, además de servir de ejemplo para el abastecimiento eléctrico de núcleos aislados de población en otros territorios, permitirá reducir la mano de obra de tareas como el riego de cultivos, así como la iluminación de edificios destinados a la educación y la sanidad, imprescindibles en el crecimiento y la mejora de la comunidad. El desarrollo de este proyecto se llevará a cabo desde la más absoluta integración con la cultura y factores de influencia del país de destino, siendo la contribución a los Objetivos de Desarrollo Sostenible y la impulsión de las energías renovables en países en vías de desarrollo, dos pilares fundamentales del mismo.es-ES
dc.description.abstractKazai is a small village located in northern Zimbabwe a few kilometers from the border with Mozambique. Historical background and almost forty years of recent dictatorship have led to one of the most severe economic crisis ever known, pushing the majority of the population into poverty and fight for self-sufficiency and subsistence. In collaboration with NGO Child Future Africa and Fundación Ingenieros ICAI, this project aims to contribute to Kazai’s development by implementing a small hydroelectric power station. In addition to serving as an example for the management of electrical supply in other isolated communities and territories, it will involve a significant decrease in crop irrigation labours, as well as lighting of some important buildings intended for educational and health purposes. These are considered essential in Kazai’s growth and life quality improvement. This project will be carried out from the total respect and integration with the destination culture, regarding Sustainable Development Goals and promotion of renewable energies in developing countries as key pillars.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleAprovechamiento de salto de agua mediante turbina en poblado de Zimbawees_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsEnergía, Renovables, Turbina, Hidráulica, Zimbabwees-ES
dc.keywordsEnergy, Renewable, Turbine, Hydraulics, Zimbabween-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States