dc.contributor.advisorAlonso Alonso, Consolaciónes-ES
dc.contributor.authorVillalba Catalán, Elenaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2020-09-08T10:14:31Z
dc.date.available2020-09-08T10:14:31Z
dc.date.issued2021es_ES
dc.identifier.urihttp://hdl.handle.net/11531/50320
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl proyecto se describe como un “Proyecto de ingeniería clásico”, en el que constan los documentos de la Memoria, Planos, Pliego de Condiciones, Presupuesto y los anexos de Localización del Emplazamiento, Estudio de Recurso Eólico, Cálculos, Estudio de Viabilidad Económica y Alineación con los Objetivos de Desarrollo Sostenible En primer lugar, se realiza un estudio sobre la localización óptima del emplazamiento en función de unos requisitos mínimos que debe de cumplir el emplazamiento para que se pueda edificar en él. Posteriormente se realiza un estudio del recurso eólico de la zona para comprobar con el programa Windographer que es un área óptima. Después se evalúa el potencial eólico con el programa WAsP. Caracterizado el viento, se realiza el diseño de la obra civil, incluyendo viales y acceso al parque, zanjas eléctricas, cimentaciones y canalizaciones para red de tierras. Una vez desarrollada la infraestructura de la obra civil se diseña la infraestructura eléctrica. Para el desarrollo de ésta, se dimensionan los cables con los criterios de intensidad máxima y caída de tensión. Además, se calculan las intensidades de cortocircuito que soportarán los cables simulando una falta monofásica a tierra con las impedancias que componen el circuito. Con los diversos cálculos se determinan las secciones de los cables, materiales, número de circuitos del parque y los distintos elementos eléctricos de medición y protección necesarios para el parque eólico. Terminado los diseños de la obra civil y eléctrica, se prosigue con la elaboración de un presupuesto y del estudio de viabilidad económica para saber la rentabilidad del proyecto. Finalmente, el proyecto finaliza con la evaluación de los objetivos de desarrollo sostenible que cumple este proyecto.es-ES
dc.description.abstractThe project is described like a “Classic engineering project” and contains the following documents: Memory, Construction plans, Solicitation document and Budget plan. In addition to this, there are five attachments: Setting-up location, Study of wind resources, Calculations, Study of economic viability and Alignment of Sustainable Development Goals (ODS). To begin with, the study of an optimal location site was carried out; being based on the requirements demanded in order to build on that location. Secondly, a study of wind resource has been carried out on the zone in order to know if the location is optimal to build the wind farm by Windographer program. After this, the wind potential and annual average energy production discharged to electrical network is estimated. by WAsP program. Following the wind research, civil work is designed. This consists of roads and access to the farm, electrical trenches, foundations, and ground piping networks to be included in the area. When the civil work is finished, it is started electrical infrastructure. For the development of that, it has been dimensioned electric cables with the requirements of maximum intensity and voltage drop. Moreover, it has been calculated the short-circuit intensity that electric cables will have to support by simulating a single-phase ground failure with the different impedances that compose the electrical circuit. With all results, it has been determined the electric section cables, materials, number of the electric circuits of the wind farm and different electric medition and protection elements necessary to the wind farm. Finally, when the designed is finished, a Budget plan and Study of economic viability is made. The Project finishes with the evaluation of the Alignment of Sustainable Development Goals that is possible in the wind farm” Pozo del Conde”.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleProyecto de ejecución del parque eólico de Pozo del Conde en Lezuza (Albacete)es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsparque eólico; terrestre; Pozo del Conde; Lezuzaes-ES
dc.keywordswind farm; onshore; Pozo del Conde; Lezuzaen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States