dc.contributor.advisorMoreno García, Manueles-ES
dc.contributor.authorBarruso Recuero, Miguel Ángeles-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2020-11-03T11:57:59Z
dc.date.available2020-11-03T11:57:59Z
dc.date.issued2021es_ES
dc.identifier.urihttp://hdl.handle.net/11531/52316
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEste proyecto consiste en la construcción de una central hidroeléctrica con el objetivo principal de abastecer energéticamente al poblado de Kazai, situado en Zimbabue. El proyecto forma parte de Project Zimbabwe, una iniciativa promovida por la Fundación de Ingenieros de ICAI y la ONG Child Future Africa, que lleva varios años realizando proyectos de índole similar con el objetivo de mejorar la calidad de vida de los habitantes de un país que carecen de los recursos necesarios para ser autosuficientes. Un aspecto fundamental de Project Zimbabwe es la participación de los locales en la construcción de los proyectos, siendo esto de vital importancia para crear un vínculo y ayudarles a desarrollarse personalmente al colaborar en el desarrollo de su comunidad. África es un continente en el que 645 millones de personas no tienen acceso a la electricidad, siendo proyectos de estas características fundamentales para lograr mejorar esta situación. Uno de los objetivos principales de este proyecto es el de aportar evidencias de la viabilidad de las centrales hidroeléctricas de pequeñas dimensiones como esta para abastecer energéticamente a zonas rurales donde es realmente difícil y costoso transportar electricidad desde las grandes centrales. Para conseguir lograr los objetivos planteados se realizará un análisis de la zona y de las posibilidades reales de generación, estudiando diferentes alternativas para el diseño, tratando de que la instalación sea lo más eficiente posible, existiendo una evidente limitación de recursos económicos y materiales. Además, se tratará de que esta sea simple y robusta con el fin de que pueda funcionar de forma prolongada sin necesidad de supervisión técnica. La realización del proyecto estaba planeada para el verano de 2021, teniendo que ser aplazado a 2022 por la situación con el Covid-19.es-ES
dc.description.abstractThis project consists of the construction of a hydroelectric power plant with the main objective of supplying energy to the village of Kazai, located in Zimbabwe. The project is part of Project Zimbabwe, an initiative promoted by Fundación de ingenieros de ICAI and the NGO Child Future Africa, which has been carrying out projects of a similar nature for several years with the aim of improving the quality of life of the inhabitants of a country that lacks the necessary resources to be self-sufficient. A fundamental aspect of Project Zimbabwe is the participation of the locals in the construction of the projects, this being of vital importance to create a bond and help them develop personally, by collaborating in the development of their community. Africa is a continent where 645 million people do not have access to electricity, and projects of this nature are essential to improve this situation. One of the main objectives of this project is to provide evidence of the viability of small hydroelectric power plants such as this one to supply energy to rural areas where it is really difficult and expensive to transport electricity from the large power plants. In order to achieve the proposed objectives, a study of the area and the real possibilities of generation will be carried out, studying different alternatives for its design, trying to make the installation as efficient as possible, given the obvious limitation of economic and material resources. Furthermore, it will be necessary to keep it simple and robust so that it can operate for a long period of time without the need for technical supervision. The realization of the project was planned for the summer of 2021, having to be postponed to 2022 due to the situation with Covid-19.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3322 Tecnología energéticaes_ES
dc.subject332202 Generación de energíaes_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleAprovechamiento de salto de agua mediante turbina en poblado de Zimbabwees_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsEnergía hidráulica, Recursos energéticos renovables, central hidroeléctrica, ONG, Turbinaes-ES
dc.keywordsHydroelectric power, Renewable energy resources, hydroelectric power plant, NGO, Turbineen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States