• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Feasibility studies of a power interconnection system for central american countries: SIEPAC Project

Thumbnail
View/Open
IIT-94-033A.pdf (381.4Kb)
Date
1994-06-01
Author
Gómez San Román, Tomás
Enamorado, Juan Carlos
Vela, Ángel
Estado
info:eu-repo/semantics/publishedVersion
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
The electrical systems of the Central American countries are linked by 230 kV ac weak border interconnections forming two separated subsystems. The first one includes Guatemala and El Salvador, and the other one comprises the systems of Honduras, Nicaragua, Costa Rica and Panamá. As a consequence, unrestricted energy exchanges among all countries are not possible. Since 1987, the following utilities have been promoting the SIEPAC project: INDE from Guatemala, CEL from EL Salvador, ENEE from Honduras, INE from Nicaragua, ICE from Costa Rica, IRHE from Panamá, together with the ENDESA Group from Spain. The SIEPAC project consists of a 1678 km long ac power transmission line that would link the six electrical systems of the region through several power substations installed close to the highest demand national centers and six control centers of energy (one for each country) to allow coordinated operation of the interconnection. This project also consideres a set of complementary assets into some countries and the border transmission line between El Salvador and Honduras, and various other equipment. The power transmission line will greately reinforce the actual border interconnections, which hace a reduced capacity of exchange and technical problems associated with the stability of a weak longitudinal system. On the other hand, economic savings for the region would be achieved, coming from a higher coordination level in the operation and planning of their systems.
 
URI
https:doi.org10.1109MPER.1994.286537
Feasibility studies of a power interconnection system for central american countries: SIEPAC Project
Tipo de Actividad
Artículos en revistas
ISSN
0272-1724
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Planning, feasibility, international interconnections
Collections
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback