Mostrar el registro sencillo del ítem

dc.contributor.authorRodríguez Penalonga, Lauraes-ES
dc.contributor.authorMoratilla Soria, Beatriz Yolandaes-ES
dc.date.accessioned2021-06-04T16:57:46Z
dc.date.available2021-06-04T16:57:46Z
dc.date.issued17/02/2021es_ES
dc.identifier.issn0363-907Xes_ES
dc.identifier.uri10.1002/er.5333es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractEste artículo presenta dos análisis económicos realizados con el modelo Mariño especialmente diseñado para analizar los costes de diferentes estrategias de gestión del de combustible nuclear gastado (SNF) en el contexto real español. Estos análisis son: (a) un estudio de Monte Carlo para dichas estrategias y (b) los efectos de una mayor vida operativa de las centrales nucleares españolas en los costes del combustible nuclear gastado. Para el primer análisis, se utilizó una distribución triangular para los diferentes costes unitarios y se utilizaron los datos y de numerosos estudios para obtener los valores requeridos para la distribución. El segundo análisis se realizó para las actuales fechas oficiales de las centrales nucleares, y los resultados se compararon con otros escenarios de vida útil. La hipótesis principal de estos escenarios era una parada progresiva de los reactores, para evitar numerosas paradas en pocos años. Estos escenarios se propusieron para 40 a 60 años de vida útil media de los reactores. Los resultados muestran que, para todos los escenarios analizados la producción adicional de electricidad debida a una mayor vida útil compensa los costes adicionales causados por la mayor cantidad de FNS que hay que gestionar. Además, para la estrategia actual de gestión de los FNS, un cierre progresivo a los 40 años de vida media operativa ha demostrado tener unos costes menores que el escenario de cierre oficial. Sin embargo, una estrategia sin una instalación centralizada sería la más favorable desde el punto de vista económico para todos los escenarios analizados.es-ES
dc.description.abstractThis article presents two economic analyses performed with the Mariño model, which was specially designed to analyse the costs of different spent nuclear fuel (SNF) management strategies in the real Spanish context. These analyses are: (a) a Monte Carlo study for those strategies and (b) the effects of a longer operational lifetime for the Spanish nuclear power plants (NPPs) on the costs of spent nuclear fuel (SNF) management. For the first analysis, a triangular distribution for the different unitary costs was assumed and the data and assumptions from numerous studies were used to obtain the values required for the distribution. The second analysis was performed for the current official shutdown dates for the NPPs, and the results were compared to other operational lifetime scenarios. The main assumption for these scenarios was a progressive shutdown of the reactors, in order to avoid numerous shutdowns in a few years. These scenarios were proposed for 40 to 60 years of mean operational lifetime of the reactors. The results show that, for all scenarios analysed, the additional electricity production due to longer operational lifetimes compensate the extra costs caused by the larger amount of SNF to be managed. Additionally, for the current SNF management strategy, a progressive shutdown at 40 years of mean operational lifetime has shown to entail lower costs than the official shutdown scenario. However, a strategy without a centralised interim storage facility would be the most economically favourable one for all the scenarios analysed.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightsCreative Commons Reconocimiento-NoComercial-SinObraDerivada Españaes_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/es_ES
dc.sourceRevista: International Journal of Energy Research, Periodo: 1, Volumen: 45, Número: , Página inicial: 269, Página final: 285es_ES
dc.subject.otherCátedra Rafael Mariño de Nuevas Tecnologías Energéticases_ES
dc.titleA proper spent nuclear fuel management strategy could enhance the continuity of nuclear power in the Spanishenergy mixes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsAlmacén temporal centralizado, ciclo abierto, reprocesado, España, combustible nuclear gastado, gestión del combustible nuclear gastadoes-ES
dc.keywordscentralised interim storage, direct disposal, reprocessing, Spain, spent nuclear fuel, spent nuclear fuel managementen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem

Creative Commons Reconocimiento-NoComercial-SinObraDerivada España
Excepto si se señala otra cosa, la licencia del ítem se describe como Creative Commons Reconocimiento-NoComercial-SinObraDerivada España