Mostrar el registro sencillo del ítem

dc.contributor.advisorHernández Bote, Juan Antonioes-ES
dc.contributor.authorJuan Álvarez, Ignacio dees-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-05-10T15:22:44Z
dc.date.available2022-05-10T15:22:44Z
dc.date.issued2022es_ES
dc.identifier.urihttp://hdl.handle.net/11531/68116
dc.descriptionGrado en Ingeniería en Tecnologías Industriales y Grado en Administración y Dirección de Empresases_ES
dc.description.abstractEn este proyecto se estudia la climatización de un edificio de oficinas situado en la comunidad de Madrid, el proyecto se ajusta con el Código Técnico de la Edificación (CTE) y el Reglamento de Instalaciones Térmicas en Edificios (RITE). El edificio consta de 4 bloques, cada bloque tiene 7 plantas sobre rasante, la cubierta y 2 plantas de garaje. Las plantas estudiadas en este proyecto van desde planta baja hasta planta ático. Se han divido las plantas en 4/5 espacios, la orientación del edificio es sureste y su superficie total es de 7527,82 m2. En primer lugar, se estudian las condiciones interiores y exteriores del proyecto para poder realizar el cálculo de cargas de invierno y de verano. Se establecen unas condiciones interiores de verano de 25 oC y 22 oC en invierno con una humedad relativa del 50% para ambas estaciones. Una vez realizado el cálculo de las condiciones interiores, se calculan las cargas de verano e invierno en los momentos más desfavorables. Estas cargas son las que han de vencer nuestros equipos para establecer unas condiciones óptimas en el interior. Para el cálculo de las cargas de verano se tienen en cuenta las cargas por radiación solar a través de vidrios, transmisión a través de los cerramientos, por ocupación y por último por la iluminación y equipos. En invierno únicamente se tienen en cuenta las cargas por transmisión ya que el resto de las cargas contribuyen positivamente a la climatización del espacio. Posteriormente, se dimensionan las tuberías y las pérdidas de carga. Para calcular el caudal correspondiente que circula de agua fría o agua caliente, se realiza el cociente del calor total efectivo entre el salto térmico (5oC para el agua fría y 10oC para el agua caliente). Con el cálculo de las pérdidas de carga se calcula la altura efectiva de las bombas. Para el dimensionamiento de conductos es necesario conocer el caudal de aire necesario para cada habitación el cual se obtiene del cálculo de las cargas de verano y se calcula también el cálculo de las perdidas de carga. Posteriormente se seleccionan los equipos de climatización. Los equipos de climatización primaria se sitúan en la cubierta, calderas, enfriadoras y climatizador. Estas unidades abastecen a los fan-coils situados en el falso techo de cada estancia. Los fan-coils son de 4 tubos, estos alimentan a los difusores que son los encargados de impulsar el aire a cada espacio. La producción de agua fría y agua caliente, la realizan las enfriadoras y las calderas. Finalmente se realiza un presupuesto, el presupuesto final es de 889.165,68€.es-ES
dc.description.abstractThis project studies the air conditioning of an office building located in the community of Madrid, the project complies with the Technical Building Code (CTE) and the Regulation of Thermal Installations in Buildings (RITE). The building consists of 4 blocks, each block has 7 floors above ground, the roof and 2 floors of garage. The floors studied in this project range from ground floor to attic floor. The floors have been divided into 4/5 spaces, the orientation of the building is southeast and its total surface is 7527,82 m2. First, the interior and exterior conditions of the project are studied in order to be able to calculate the winter and summer loads. Indoor summer conditions are set at 25 oC and 22 oC in winter with a relative humidity of 50% for both seasons. Once the indoor conditions have been calculated, the summer and winter loads are calculated at the most unfavorable times. These loads are the ones that our equipment must overcome in order to establish optimum indoor conditions. For the calculation of the summer loads, we take into account the loads due to solar radiation through glass, transmission through the enclosures, occupancy and, finally, lighting and equipment. In winter, only transmission loads are considered, as the rest of the loads contribute positively to the air conditioning of the space. Subsequently, the pipes and pressure losses are dimensioned. To calculate the corresponding flow rate of cold water or hot water, the quotient of the total effective heat by the thermal jump (5oC for cold water and 10oC for hot water) is used. By calculating the head losses, the effective head of the pumps is calculated. For duct sizing it is necessary to know the required airflow for each room, which is obtained from the calculation of the summer loads and the calculation of the load losses. Subsequently, the air-conditioning units are selected. The primary air-conditioning equipment is located on the roof, boilers, chillers and air-conditioners. These units supply the fan coils located in the false ceiling of each room. The fan coils are 4 pipes, these feed the diffusers that are responsible for driving the air to each space. The production of cold water and hot water is carried out by the chillers and boilers. Finally, a budget is made, the final budget is 889.165,68€.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicaes_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un edificio de oficinas en Madrides_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsClimatización, tuberías, conductos, equipos, presupuestoes-ES
dc.keywordsAir conditioning, piping, ducting, equipment, budgeten-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States