Long term maintenance optimization of CCGT plants

dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.date.accessioned2016-01-15T11:26:46Z
dc.date.available2016-01-15T11:26:46Z
dc.date.issued2012-09-20
dc.descriptionCapítulos en libros
dc.description.abstractThe rising share of renewable energies within the generation mix has reduced the load factor of actual CCGT power plants. In this way, a more flexible operation of this technology with an increased number of annual start-up cycles is needed. Since CCGT design assumed a base load operation at nominal power with a few number of annual start cycles, plant owners have to face higher maintenance costs, reliability reduction and lower market incomes. This paper presents a mixed-integer optimization model that schedules the long term maintenance planning based on the daily operation of a CCGT plant in order to maximize its global profit. The model is illustrated with an actual CCGT plant operating in the Spanish power system.es-ES
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.format.mimetypeapplication/pdf
dc.identifier.urihttp://hdl.handle.net/11531/5544
dc.keywordsmaintenance planning; unitcommitment; optimization modelses-ES
dc.language.isoen-GB
dc.publisherSin editorial (Shanghai, China)
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccess
dc.rights.uries_ES
dc.sourceLibro: 4th IEEE PES Asia-Pacific Power and Energy Engineering Conference - APPEEC 2012, Página inicial: 1-4, Página final:
dc.subject.otherInstituto de Investigación Tecnológica (IIT)
dc.titleLong term maintenance optimization of CCGT plants
dc.typeinfo:eu-repo/semantics/bookPart

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
IIT-12-029A.pdf
Size:
253.03 KB
Format:
Adobe Portable Document Format

Collections