Helping all generations of photo-voltaic inverters ride-through voltage sags

dc.contributor.authorRoldan Perez, Javieres-ES
dc.contributor.authorGarcía Cerrada, Aurelioes-ES
dc.contributor.authorZamora Macho, Juan Luises-ES
dc.contributor.authorOchoa Giménez, Migueles-ES
dc.date.accessioned2016-01-15T11:15:16Z
dc.date.available2016-01-15T11:15:16Z
dc.date.issued2014-10-01es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractThe late Spanish grid code established that, to avoid island operation, renewable power sources have to be disconnected from the grid in the case of a voltage sag. This would threaten the system stability in case of massive penetration of renewable sources and motivated a recent revision of the code. The new code establishes strict ratios between active and reactive currents during the sag and requests that the plant must quickly resume its normal operation, when the voltage sag ends. Existing installations are also affected if they want to enjoy the premiums associated with renewable generation. When full upgrading of existing installations is not practical, this study proposes a plug-in shunt-connected power electronics device to help solar plants comply with the new grid code, without modifying the solar inverters. The device and its control algorithm are explained in this study and experimental results using photo-voltaic inverters without low-voltage ride-through capability are presented. Solar inverters remain unaware of the voltage sag and they can be led quickly and smoothly back into the grid when the sag is over.es-ES
dc.description.abstractThe late Spanish grid code established that, to avoid island operation, renewable power sources have to be disconnected from the grid in the case of a voltage sag. This would threaten the system stability in case of massive penetration of renewable sources and motivated a recent revision of the code. The new code establishes strict ratios between active and reactive currents during the sag and requests that the plant must quickly resume its normal operation, when the voltage sag ends. Existing installations are also affected if they want to enjoy the premiums associated with renewable generation. When full upgrading of existing installations is not practical, this study proposes a plug-in shunt-connected power electronics device to help solar plants comply with the new grid code, without modifying the solar inverters. The device and its control algorithm are explained in this study and experimental results using photo-voltaic inverters without low-voltage ride-through capability are presented. Solar inverters remain unaware of the voltage sag and they can be led quickly and smoothly back into the grid when the sag is over.en-GB
dc.description.abstract<p>The late Spanish grid code established that, to avoid island operation, renewable power sources have to be disconnected from the grid in the case of a voltage sag. This would threaten the system stability in case of massive penetration of renewable sources and motivated a recent revision of the code. The new code establishes strict ratios between active and reactive currents during the sag and requests that the plant must quickly resume its normal operation, when the voltage sag ends. Existing installations are also affected if they want to enjoy the premiums associated with renewable generation. When full upgrading of existing installations is not practical, this study proposes a plug-in shunt-connected power electronics device to help solar plants comply with the new grid code, without modifying the solar inverters. The device and its control algorithm are explained in this study and experimental results using photo-voltaic inverters without low-voltage ride-through capability are presented. Solar inverters remain unaware of the voltage sag and they can be led quickly and smoothly back into the grid when the sag is over.</p>es
dc.description.abstract<p>The late Spanish grid code established that, to avoid island operation, renewable power sources have to be disconnected from the grid in the case of a voltage sag. This would threaten the system stability in case of massive penetration of renewable sources and motivated a recent revision of the code. The new code establishes strict ratios between active and reactive currents during the sag and requests that the plant must quickly resume its normal operation, when the voltage sag ends. Existing installations are also affected if they want to enjoy the premiums associated with renewable generation. When full upgrading of existing installations is not practical, this study proposes a plug-in shunt-connected power electronics device to help solar plants comply with the new grid code, without modifying the solar inverters. The device and its control algorithm are explained in this study and experimental results using photo-voltaic inverters without low-voltage ride-through capability are presented. Solar inverters remain unaware of the voltage sag and they can be led quickly and smoothly back into the grid when the sag is over.</p>en
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.format.mimetypeapplication/pdfes_ES
dc.identifier.issn1755-4535es_ES
dc.identifier.urihttps://doi.org/10.1049/iet-pel.2013.0552es_ES
dc.keywordspower generation control; photovoltaic power systems; invertors; power supply qualityes-ES
dc.keywordspower generation control; photovoltaic power systems; invertors; power supply qualityen-GB
dc.keywordspower generation control; photovoltaic power systems; invertors; power supply qualityes
dc.keywordspower generation control; photovoltaic power systems; invertors; power supply qualityen
dc.language.isoen-GB
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: IET Power Electronics, Periodo: 1, Volumen: online, Número: 10, Página inicial: 2555, Página final: 2563es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleHelping all generations of photo-voltaic inverters ride-through voltage sagses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
IIT-14-075A.pdf
Size:
1.02 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-14-075A_preview
Size:
2.94 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-14-075A_preview.pdf
Size:
2.94 KB
Format:
Adobe Portable Document Format

Collections