A practical approach to solve power system constraints with application to the Spanish electricity market

dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.date.accessioned2016-05-23T03:06:55Z
dc.date.available2016-05-23T03:06:55Z
dc.date.issued2004-11-01
dc.descriptionArtículos en revistas
dc.description.abstractThe solution of power system constraints is an important issue that has to be addressed to achieve a fair operation of a competitive electricity market. In the Spanish electricity market, the System Operator (SO) is in charge of determining the technical feasibility of the generation dispatch provided by the Market Operator (MO). An optimal solution method of power system constraints in the Spanish market must take into account the connection of off-line units to solve both branch overloads and voltage constraints, the adjustment of voltage control resources, the solution of the postulated n-1 and n-2 contingencies with a preventive criteria and the coupling of the solution in the 24 hourly scenarios due to the start-up cost of nonconnected units. This paper details the management of power system constraints in the Spanish market, and contains a comprehensive review of solution methods of power system constraints. In addition, the paper proposes a novel approach to solve Spanish power system constraints that overcomes the limitations of existing methods, by decoupling the solution of branch overloads and voltage constraints. Francisco Miguel Echavarren Cerezo, M.I. Navarrete, R. Casanova, G. López,es-ES
dc.description.abstract<p>The solution of power system constraints is an important issue that has to be addressed to achieve a fair operation of a competitive electricity market. In the Spanish electricity market, the System Operator (SO) is in charge of determining the technical feasibility of the generation dispatch provided by the Market Operator (MO). An optimal solution method of power system constraints in the Spanish market must take into account the connection of off-line units to solve both branch overloads and voltage constraints, the adjustment of voltage control resources, the solution of the postulated n-1 and n-2 contingencies with a preventive criteria and the coupling of the solution in the 24 hourly scenarios due to the start-up cost of nonconnected units. This paper details the management of power system constraints in the Spanish market, and contains a comprehensive review of solution methods of power system constraints. In addition, the paper proposes a novel approach to solve Spanish power system constraints that overcomes the limitations of existing methods, by decoupling the solution of branch overloads and voltage constraints. Francisco Miguel Echavarren Cerezo, M.I. Navarrete, R. Casanova, G. L&oacute;pez,</p>es
dc.description.abstract<p>The solution of power system constraints is an important issue that has to be addressed to achieve a fair operation of a competitive electricity market. In the Spanish electricity market, the System Operator (SO) is in charge of determining the technical feasibility of the generation dispatch provided by the Market Operator (MO). An optimal solution method of power system constraints in the Spanish market must take into account the connection of off-line units to solve both branch overloads and voltage constraints, the adjustment of voltage control resources, the solution of the postulated n-1 and n-2 contingencies with a preventive criteria and the coupling of the solution in the 24 hourly scenarios due to the start-up cost of nonconnected units. This paper details the management of power system constraints in the Spanish market, and contains a comprehensive review of solution methods of power system constraints. In addition, the paper proposes a novel approach to solve Spanish power system constraints that overcomes the limitations of existing methods, by decoupling the solution of branch overloads and voltage constraints. Francisco Miguel Echavarren Cerezo, M.I. Navarrete, R. Casanova, G. L&oacute;pez,</p>en
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.format.mimetypeapplication/pdf
dc.identifier.issn0885-8950
dc.identifier.urihttps://doi.org/10.1109/TPWRS.2004.831704
dc.keywordsPower system dispatch, security assessment, congestion management, optimal power flow, unit commitmentes-ES
dc.keywordsPower system dispatch, security assessment, congestion management, optimal power flow, unit commitmentes
dc.keywordsPower system dispatch, security assessment, congestion management, optimal power flow, unit commitmenten
dc.language.isoen-GB
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 4, Página inicial: 2029, Página final: 2037
dc.subject.otherInstituto de Investigación Tecnológica (IIT)
dc.titleA practical approach to solve power system constraints with application to the Spanish electricity market
dc.typeinfo:eu-repo/semantics/article

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
IIT-04-098R.pdf
Size:
492.79 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-04-098R_preview
Size:
3.27 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-04-098R_preview.pdf
Size:
3.27 KB
Format:
Adobe Portable Document Format

Collections