Self-unit commitment of combined-cycle units with real operational constraints

dc.contributor.authorGonzález Sierra, Mauroes-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.date.accessioned2024-02-23T13:15:31Z
dc.date.available2024-02-23T13:15:31Z
dc.date.issued2024-01-01es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractThis paper highlights the importance of accurately modeling the operational constraints of Combined-Cycle Gas Turbines (CCGTs) within a unit-commitment framework. In practice, in Colombia, when given an initial dispatch by the Independent System Operator, CCGT plants are operated according to the results of heuristic simulation codes. Such heuristics often omit technical operating constraints, including hot, warm, or cold startup ramps; the minimum operation hours required for a gas turbine to start a steam turbine; the relationship between the dispatched number of steam and gas turbines; the load distribution among gas turbines; and supplementary fires. Most unit-commitment models in the literature represent standard technical constraints like startup, shutdown, up/down ramps, and in some cases, supplementary fires. However, they typically overlook other real-life CCGT operating constraints, which were considered in this work. These constraints are crucial in integrated energy systems to avoid equipment damage, which can potentially put CCGT plants out of service and ultimately lead to lower operating costs.es-ES
dc.description.abstractThis paper highlights the importance of accurately modeling the operational constraints of Combined-Cycle Gas Turbines (CCGTs) within a unit-commitment framework. In practice, in Colombia, when given an initial dispatch by the Independent System Operator, CCGT plants are operated according to the results of heuristic simulation codes. Such heuristics often omit technical operating constraints, including hot, warm, or cold startup ramps; the minimum operation hours required for a gas turbine to start a steam turbine; the relationship between the dispatched number of steam and gas turbines; the load distribution among gas turbines; and supplementary fires. Most unit-commitment models in the literature represent standard technical constraints like startup, shutdown, up/down ramps, and in some cases, supplementary fires. However, they typically overlook other real-life CCGT operating constraints, which were considered in this work. These constraints are crucial in integrated energy systems to avoid equipment damage, which can potentially put CCGT plants out of service and ultimately lead to lower operating costs.en-GB
dc.description.abstract<p>This paper highlights the importance of accurately modeling the operational constraints of Combined-Cycle Gas Turbines (CCGTs) within a unit-commitment framework. In practice, in Colombia, when given an initial dispatch by the Independent System Operator, CCGT plants are operated according to the results of heuristic simulation codes. Such heuristics often omit technical operating constraints, including hot, warm, or cold startup ramps; the minimum operation hours required for a gas turbine to start a steam turbine; the relationship between the dispatched number of steam and gas turbines; the load distribution among gas turbines; and supplementary fires. Most unit-commitment models in the literature represent standard technical constraints like startup, shutdown, up/down ramps, and in some cases, supplementary fires. However, they typically overlook other real-life CCGT operating constraints, which were considered in this work. These constraints are crucial in integrated energy systems to avoid equipment damage, which can potentially put CCGT plants out of service and ultimately lead to lower operating costs.</p>es
dc.description.abstract<p>This paper highlights the importance of accurately modeling the operational constraints of Combined-Cycle Gas Turbines (CCGTs) within a unit-commitment framework. In practice, in Colombia, when given an initial dispatch by the Independent System Operator, CCGT plants are operated according to the results of heuristic simulation codes. Such heuristics often omit technical operating constraints, including hot, warm, or cold startup ramps; the minimum operation hours required for a gas turbine to start a steam turbine; the relationship between the dispatched number of steam and gas turbines; the load distribution among gas turbines; and supplementary fires. Most unit-commitment models in the literature represent standard technical constraints like startup, shutdown, up/down ramps, and in some cases, supplementary fires. However, they typically overlook other real-life CCGT operating constraints, which were considered in this work. These constraints are crucial in integrated energy systems to avoid equipment damage, which can potentially put CCGT plants out of service and ultimately lead to lower operating costs.</p>en
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.format.mimetypeapplication/octet-streames_ES
dc.identifier.issn1996-1073es_ES
dc.identifier.urihttps://doi.org/10.3390/en17010051es_ES
dc.keywordsCombined-Cycle Gas Units (CCGs); unit commitment; steam turbines; startup rampses-ES
dc.keywordsCombined-Cycle Gas Units (CCGs); unit commitment; steam turbines; startup rampsen-GB
dc.keywordsCombined-Cycle Gas Units (CCGs); unit commitment; steam turbines; startup rampses
dc.keywordsCombined-Cycle Gas Units (CCGs); unit commitment; steam turbines; startup rampsen
dc.language.isoen-GB
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: Energies, Periodo: 1, Volumen: online, Número: 1, Página inicial: 51-1, Página final: 51-18es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleSelf-unit commitment of combined-cycle units with real operational constraintses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
Self-unit%20commitment%20of%20combined-cycle%20units%20with%20real%20operational%20constraints
Size:
993.04 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-24-016R.pdf
Size:
993.04 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-24-016R_preview.pdf
Size:
2.87 KB
Format:
Adobe Portable Document Format

Collections