Self-fulfilling or self-destroying prophecy? The relevance of de-rating factors in modern capacity mechanisms

dc.contributor.authorBrito Pereira, Pauloes-ES
dc.contributor.authorRodilla Rodríguez, Pabloes-ES
dc.contributor.authorMastropietro, Paoloes-ES
dc.contributor.authorBatlle López, Carloses-ES
dc.date.accessioned2022-04-01T03:05:44Z
dc.date.available2022-04-01T03:05:44Z
dc.date.issued2022-05-15es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractCapacity mechanisms aim at enhancing mid- to long-term reliability by adding an extra income for generation and demand response resources, based on their firm capacity, a parameter commonly defined by the regulator. The firm capacity is often calculated by multiplying the installed capacity by a de-rating factor, to reflect the expected capability of the resources to contribute to system reliability. Computing de-rating factors is quite a challenging and pivotal task, for any error in its determination can seriously affect the performance of the capacity mechanism. In this paper, using a two-step model that simulates both the capacity auction and the short-term market, we show that the ex-ante definition of firm capacity influences investment decisions, altering the resulting resource mix and, in the end, the very contribution to the system reliability of the resources. Being aware of this potential mismatch caused by the definition of the firm capacity is fundamental for regulators to avoid paying for something that may be unable to contribute to meet the desired reliability target, or which could even deteriorate system adequacy. The discussion is illustrated with a case example, focusing on the impact of the definition of solar PV de-rating on the outcome of the capacity mechanism and the reliability of the system.es-ES
dc.description.abstractCapacity mechanisms aim at enhancing mid- to long-term reliability by adding an extra income for generation and demand response resources, based on their firm capacity, a parameter commonly defined by the regulator. The firm capacity is often calculated by multiplying the installed capacity by a de-rating factor, to reflect the expected capability of the resources to contribute to system reliability. Computing de-rating factors is quite a challenging and pivotal task, for any error in its determination can seriously affect the performance of the capacity mechanism. In this paper, using a two-step model that simulates both the capacity auction and the short-term market, we show that the ex-ante definition of firm capacity influences investment decisions, altering the resulting resource mix and, in the end, the very contribution to the system reliability of the resources. Being aware of this potential mismatch caused by the definition of the firm capacity is fundamental for regulators to avoid paying for something that may be unable to contribute to meet the desired reliability target, or which could even deteriorate system adequacy. The discussion is illustrated with a case example, focusing on the impact of the definition of solar PV de-rating on the outcome of the capacity mechanism and the reliability of the system.en-GB
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.format.mimetypeapplication/pdfes_ES
dc.identifier.issn0306-2619es_ES
dc.identifier.urihttps://doi.org/10.1016/j.apenergy.2022.118939es_ES
dc.keywordsCapacity mechanisms; Reliability; Security of supply; De-rating; Firm capacity; Capacity auctionses-ES
dc.keywordsCapacity mechanisms; Reliability; Security of supply; De-rating; Firm capacity; Capacity auctionsen-GB
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.holderes_ES
dc.rights.uries_ES
dc.sourceRevista: Applied Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 118939, Página final: 0es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleSelf-fulfilling or self-destroying prophecy? The relevance of de-rating factors in modern capacity mechanismses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES

Files

Original bundle

Now showing 1 - 5 of 5
Loading...
Thumbnail Image
Name:
IIT-22-045R.pdf
Size:
1.24 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-22-045R_preprint
Size:
571.65 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-22-045R_preview
Size:
2.93 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-22-045R_preprint.pdf
Size:
571.65 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-22-045R_preview.pdf
Size:
2.93 KB
Format:
Adobe Portable Document Format

Collections