Coordination of generation and transmission development through generation transmission charges - a game theoretical approach

dc.contributor.authorTohidi, Yaseres-ES
dc.date.accessioned2016-12-01T04:06:57Z
dc.date.available2016-12-01T04:06:57Z
dc.date.issued2017-03-01
dc.descriptionArtículos en revistas
dc.description.abstractTransmission charges aim to recover the cost of transmission network investments and provide efficient locational signals to new generators. In this paper, we investigate the effect of these charges on the development of new generation capacities in the system. Generation expansion planning is decided by strategic generation planners (SGPs) trying to maximize their profits, while transmission line investments are planned by a central planner and regulatory body aimed at minimizing the overall operation and network investment costs of the system. Regulatory transmission charges (RTCs) are calculated according to the marginal responsibility of generation investment on transmission network investment costs. An iterative algorithm is proposed to model the interaction taking place between the central planner and SGPs. The developed methodology is applied to a 2-node illustrative example and the IEEE-RTS96, and effects of RTCs on investment decisions of SGPs are analyzed.es-ES
dc.description.abstract<p>Transmission charges aim to recover the cost of transmission network investments and provide efficient locational signals to new generators. In this paper, we investigate the effect of these charges on the development of new generation capacities in the system. Generation expansion planning is decided by strategic generation planners (SGPs) trying to maximize their profits, while transmission line investments are planned by a central planner and regulatory body aimed at minimizing the overall operation and network investment costs of the system. Regulatory transmission charges (RTCs) are calculated according to the marginal responsibility of generation investment on transmission network investment costs. An iterative algorithm is proposed to model the interaction taking place between the central planner and SGPs. The developed methodology is applied to a 2-node illustrative example and the IEEE-RTS96, and effects of RTCs on investment decisions of SGPs are analyzed.</p>es
dc.description.abstract<p>Transmission charges aim to recover the cost of transmission network investments and provide efficient locational signals to new generators. In this paper, we investigate the effect of these charges on the development of new generation capacities in the system. Generation expansion planning is decided by strategic generation planners (SGPs) trying to maximize their profits, while transmission line investments are planned by a central planner and regulatory body aimed at minimizing the overall operation and network investment costs of the system. Regulatory transmission charges (RTCs) are calculated according to the marginal responsibility of generation investment on transmission network investment costs. An iterative algorithm is proposed to model the interaction taking place between the central planner and SGPs. The developed methodology is applied to a 2-node illustrative example and the IEEE-RTS96, and effects of RTCs on investment decisions of SGPs are analyzed.</p>en
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.format.mimetypeapplication/pdf
dc.identifier.issn0885-8950
dc.identifier.urihttps://doi.org/10.1109/TPWRS.2016.2581218
dc.keywordsGeneration expansion planning; Game theory; Marginal transmission charges.es-ES
dc.keywordsGeneration expansion planning; Game theory; Marginal transmission charges.es
dc.keywordsGeneration expansion planning; Game theory; Marginal transmission charges.en
dc.language.isoen-GB
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 2, Página inicial: 1103, Página final: 1114
dc.subject.otherInstituto de Investigación Tecnológica (IIT)
dc.titleCoordination of generation and transmission development through generation transmission charges - a game theoretical approach
dc.typeinfo:eu-repo/semantics/article

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
IIT-16-154A.pdf
Size:
349.32 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-16-154A_preview
Size:
2.76 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-16-154A_preview.pdf
Size:
2.76 KB
Format:
Adobe Portable Document Format

Collections