A reduced-order model for simulation of back-to- back start-up of synchronous motors in pumped storage hydropower plants

dc.contributor.authorRouco Rodríguez, Luises-ES
dc.contributor.authorAntolín Liñán, Maríaes-ES
dc.date.accessioned2024-04-23T10:23:33Z
dc.date.available2024-04-23T10:23:33Z
dc.description.abstractes-ES
dc.description.abstractThis paper proposes a reduced-order model for the simulation of back-to-back start-up of synchronous motors in pumped storage hydropower plants aimed at calculating the starting time of the generator-motor set. It is assumed that the back-to-back start-up process is governed by a predefined gate set point-time profile to the governor of the synchronous generator. Simulation of detailed and reduced-order models arecompared. Sensitivity analysis with respect to the parameters of the gate set point-time profile is presented.en-GB
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.format.mimetypeapplication/pdfes_ES
dc.identifier.urihttp://hdl.handle.net/11531/88299
dc.keywordses-ES
dc.keywordsPumped-storage power plants, Fixed-speed synchronous machines, back-to-back start-up, detailed model, reduced-order model.en-GB
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.rights.uries_ES
dc.titleA reduced-order model for simulation of back-to- back start-up of synchronous motors in pumped storage hydropower plantses_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
IIT-24-122C.pdf
Size:
277.37 KB
Format:
Adobe Portable Document Format