dc.description.abstractIn the context of incentive regulation applied to electricity distribution companies, reference network models (RNMs) can be a valuable tool to estimate their efficient costs. Thesemodels have to plan large-scale electricity distribution areas with different voltage levels. This paper describes the planning algorithms proposed to optimize the location, size, and supply area of the mediumvoltage/ low-voltage transformer substations in an RNM that has to plan a network from scratch (Greenfield planning). The presented methodology aims to divide the entire planning area into small zones with a nonpredetermined area so that each one can be optimized separately. Then, a heuristic process based on -means algorithm seeks to find the set of clusters that minimize the cost function, considering the cost of the transformer substations, as well as the LV and MV network costs. The presented case studies show the benefits of applying the proposed methodology.es-ES
dc.description.abstract<p>In the context of incentive regulation applied to electricity distribution companies, reference network models (RNMs) can be a valuable tool to estimate their efficient costs. Thesemodels have to plan large-scale electricity distribution areas with different voltage levels. This paper describes the planning algorithms proposed to optimize the location, size, and supply area of the mediumvoltage/ low-voltage transformer substations in an RNM that has to plan a network from scratch (Greenfield planning). The presented methodology aims to divide the entire planning area into small zones with a nonpredetermined area so that each one can be optimized separately. Then, a heuristic process based on -means algorithm seeks to find the set of clusters that minimize the cost function, considering the cost of the transformer substations, as well as the LV and MV network costs. The presented case studies show the benefits of applying the proposed methodology.</p>es
dc.description.abstract<p>In the context of incentive regulation applied to electricity distribution companies, reference network models (RNMs) can be a valuable tool to estimate their efficient costs. Thesemodels have to plan large-scale electricity distribution areas with different voltage levels. This paper describes the planning algorithms proposed to optimize the location, size, and supply area of the mediumvoltage/ low-voltage transformer substations in an RNM that has to plan a network from scratch (Greenfield planning). The presented methodology aims to divide the entire planning area into small zones with a nonpredetermined area so that each one can be optimized separately. Then, a heuristic process based on -means algorithm seeks to find the set of clusters that minimize the cost function, considering the cost of the transformer substations, as well as the LV and MV network costs. The presented case studies show the benefits of applying the proposed methodology.</p>en
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.format.mimetypeapplication/pdf
dc.identifier.issn0885-8977
dc.identifier.urihttps://doi.org/10.1109/TPWRD.2013.2258944
dc.keywordsPower distribution, power system planning, reference network model, substation planning.es-ES
dc.keywordsPower distribution, power system planning, reference network model, substation planning.es
dc.keywordsPower distribution, power system planning, reference network model, substation planning.en
dc.language.isoen-GB
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: IEEE Transactions on Power Delivery, Periodo: 1, Volumen: online, Número: 4, Página inicial: 2245, Página final: 2253
dc.subject.otherInstituto de Investigación Tecnológica (IIT)
dc.titleLarge-scale MV/LV transformer substation planning considering network costs and flexible area decomposition
dc.typeinfo:eu-repo/semantics/article

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
IIT-13-072A.pdf
Size:
942.93 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-13-072A_preview
Size:
2.78 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-13-072A_preview.pdf
Size:
2.78 KB
Format:
Adobe Portable Document Format

Collections