Optimal joint energy and secondary regulation reserve hourly scheduling of variable speed pumped storage hydropower plants

dc.contributor.authorChazarra Jover, Manueles-ES
dc.date.accessioned2017-05-09T06:42:37Z
dc.date.available2017-05-09T06:42:37Z
dc.date.issued2018-01-01
dc.descriptionArtículos en revistas
dc.description.abstractThis paper presents a mixed integer linear programming model for the hourly energy and secondary regulation reserve scheduling of a price-taker and closed-loop variable speed pumped-storage hydropower plant, considering the energy losses due to the use of electronic frequency converters. The plant participates in the day-ahead energy market and in the secondary regulation service of the Iberian electric power system. The model is utilised to compare the income of the plant with and without considering the variable speed technology, with synchronous or asynchronous machines, with and without bypassing the frequency converter in generating mode, and with and without perfect information of the electric power system data. Numerical testing results demonstrate that the operation with the variable speed technology could help notably to enlarge the income of the power plant and that the secondary regulation reserve market might be the main source of revenue for the power plant.es-ES
dc.description.abstractThis paper presents a mixed integer linear programming model for the hourly energy and secondary regulation reserve scheduling of a price-taker and closed-loop variable speed pumped-storage hydropower plant, considering the energy losses due to the use of electronic frequency converters. The plant participates in the day-ahead energy market and in the secondary regulation service of the Iberian electric power system. The model is utilised to compare the income of the plant with and without considering the variable speed technology, with synchronous or asynchronous machines, with and without bypassing the frequency converter in generating mode, and with and without perfect information of the electric power system data. Numerical testing results demonstrate that the operation with the variable speed technology could help notably to enlarge the income of the power plant and that the secondary regulation reserve market might be the main source of revenue for the power plant.es
dc.description.abstractThis paper presents a mixed integer linear programming model for the hourly energy and secondary regulation reserve scheduling of a price-taker and closed-loop variable speed pumped-storage hydropower plant, considering the energy losses due to the use of electronic frequency converters. The plant participates in the day-ahead energy market and in the secondary regulation service of the Iberian electric power system. The model is utilised to compare the income of the plant with and without considering the variable speed technology, with synchronous or asynchronous machines, with and without bypassing the frequency converter in generating mode, and with and without perfect information of the electric power system data. Numerical testing results demonstrate that the operation with the variable speed technology could help notably to enlarge the income of the power plant and that the secondary regulation reserve market might be the main source of revenue for the power plant.en
dc.description.versioninfo:eu-repo/semantics/publishedVersion
dc.format.mimetypeapplication/pdf
dc.identifier.issn0885-8950
dc.identifier.urihttps://doi.org/10.1109/TPWRS.2017.2699920
dc.keywordsPumped Storage Plant, Secondary Regulation Service, Variable Speed Technology, Risk Aversion, Scenario-based Approach.es-ES
dc.keywordsPumped Storage Plant, Secondary Regulation Service, Variable Speed Technology, Risk Aversion, Scenario-based Approach.es
dc.keywordsPumped Storage Plant, Secondary Regulation Service, Variable Speed Technology, Risk Aversion, Scenario-based Approach.en
dc.language.isoen-GB
dc.rightses_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.rights.holderes_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 1, Página inicial: 103, Página final: 115
dc.subject.otherInstituto de Investigación Tecnológica (IIT)
dc.titleOptimal joint energy and secondary regulation reserve hourly scheduling of variable speed pumped storage hydropower plants
dc.typeinfo:eu-repo/semantics/article

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
IIT-17-077A.pdf
Size:
1.46 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IIT-17-077A_preview
Size:
2.78 KB
Format:
Unknown data format
Loading...
Thumbnail Image
Name:
IIT-17-077A_preview.pdf
Size:
2.78 KB
Format:
Adobe Portable Document Format

Collections