| Fecha de publicación | Título | Autor(es) |
| 1-jun-2017 | Deriving optimal end of day storage for pumped-storage power plants in the joint energy and reserve day-ahead scheduling | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 1-sep-2019 | Economic effects of forecasting inaccuracies in the automatic frequency restoration service for the day-ahead energy and reserve scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier; Helseth, Arild |
| - | Economic impact of forecasting errors in residual reserve curves in the day-ahead scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier; Helseth, Arild |
| 18-jun-2017 | Economic impact of forecasting errors in residual reserve curves in the day-ahead scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier; Helseth, Arild |
| - | Economic viability of pumped-storage power plants equipped with ternary units and considering hydraulic short-circuit operation | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 15-abr-2018 | Economic viability of pumped-storage power plants participating in the secondary regulation service | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier; Praus, Roland |
| - | Optimal energy and reserve scheduling of pumped-storage power plants considering hydraulic short-circuit operation | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 1-ene-2017 | Optimal energy and reserve scheduling of pumped-storage power plants considering hydraulic short-circuit operation | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 18-jun-2017 | Optimal energy and reserve scheduling of pumped-storage power plants considering hydraulic short-circuit operation | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 1-ene-2018 | Optimal joint energy and secondary regulation reserve hourly scheduling of variable speed pumped storage hydropower plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 1-ene-2016 | Stochastic optimization model for the weekly scheduling of a hydropower system in day-ahead and secondary regulation reserve markets | Chazarra Jover, Manuel; García González, Javier; Pérez-Díaz, Juan I.; Arteseros, Montserrat |
| 1-abr-2015 | Trends and challenges in the operation of pumped-storage hydropower plants | Pérez-Díaz, Juan I.; Chazarra Jover, Manuel; García González, Javier; Cavazzini, G.; Stoppato, A. |
| - | Trends and challenges in the operation of pumped-storage hydropower plants | Pérez-Díaz, Juan I.; Chazarra Jover, Manuel; García González, Javier; Cavazzini, G.; Stoppato, A. |
| - | Value of perfect information of spot prices in the joint energy and reserve hourly scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 1-jul-2017 | Value of perfect information of spot prices in the joint energy and reserve hourly scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |
| 6-jun-2016 | Value of perfect information of spot prices in the joint energy and reserve hourly scheduling of pumped storage plants | Chazarra Jover, Manuel; Pérez-Díaz, Juan I.; García González, Javier |