Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/103169Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.advisor | Alonso Alonso, Consolación | es-ES |
| dc.contributor.author | Orihuel Ginestar, Alicia | es-ES |
| dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
| dc.date.accessioned | 2025-09-01T11:54:49Z | - |
| dc.date.available | 2025-09-01T11:54:49Z | - |
| dc.date.issued | 2026 | es_ES |
| dc.identifier.uri | http://hdl.handle.net/11531/103169 | es_ES |
| dc.description | Grado en Ingeniería en Tecnologías Industriales | es_ES |
| dc.description.abstract | Este Trabajo Fin de Grado desarrolla el diseño y el estudio de viabilidad de una planta solar fotovoltaica de gran escala de 64,994 MWp situada en Montequinto, Sevilla, en el marco de la transición energética española y el objetivo nacional de alcanzar 76 GW fotovoltaicos en 2030. El trabajo se estructura en cuatro etapas. La primera consistió en la selección del emplazamiento mediante un análisis multicriterio entre tres candidatos:Manzanares, Don Benito y Montequinto, siendo este último el elegido por combinar una irradiación global horizontal de 1.914 kWh/m² anuales, una parcela de 120 hectáreas con pendiente contenida y una distancia de solo 1,6 km al punto de conexión a la red de REE. La segunda etapa fue la optimización técnica de la planta mediante PVsyst, siguiendo un proceso secuencial que determinó el ratio DC/AC óptimo de 1,11, la disposición de seguidores 1V a 6 m de distancia entre ejes, el módulo bifacial Longi Solar LR7-72HYD-660M de 660 Wp y el inversor central Sungrow SG3400-HV-20. La instalación queda compuesta por 98.475 módulos, 17 inversores y un seguidor de eje horizontal con algoritmo de backtracking. La simulación energética arroja una producción neta de 141.198 MWh en el primer año, un Performance Ratio del 86,4% y una producción media a 30 años de 133.046 MWh anuales, con un factor de capacidad del 23,37%. Finalmente, el modelo de viabilidad económica, construido sobre una inversión total de 38,48 M€ y una tarifa de referencia de 46,09 €/MWh, obtiene un VAN del proyecto de 18,24 M€, una TIR del 9,15% superior al WACC del 5,40% y un LCOE de 33,6 €/MWh. El proyecto recupera la inversión en algo menos de once años y evita la emisión de 1,13 millones de toneladas de CO₂ a lo largo de su vida útil. | es-ES |
| dc.description.abstract | This TFG develops the design and feasibility study of a large-scale photovoltaic solar plant with a capacity of 64.994 MWp located in Montequinto, Sevilla, within the context of Spain's energy transition and its national target of reaching 76 GW of installed photovoltaic capacity by 2030. The work is structured around four stages. The first involved the selection of the site through a multi-criteria analysis comparing three candidate locations: Manzanares, Don Benito and Montequinto, with the latter chosen for combining a global horizontal irradiance of 1,914 kWh/m² per year, a 120 hectare plot with a contained average slope, and a distance of just 1.6 km to the REE grid connection point. The second stage was the technical optimisation of the plant using PVsyst, following a sequential process that determined the optimal DC/AC ratio of 1.11, a single-row tracker layout at 6 m pitch, the bifacial module Longi Solar LR7-72HYD-660M at 660 Wp, and the Sungrow SG3400-HV-20 central inverter. The final configuration comprises 98,475 modules, 17 inverters and a horizontal single-axis tracker with backtracking algorithm. The energy simulation yields a net output of 141,198 MWh in the first year, a Performance Ratio of 86.4%, and an average annual production of 133,046 MWh over the 30-year lifetime, with a mean capacity factor of 23.37%. Finally, the economic feasibility model, built on a total investment of €38.48 M and a reference tariff of €46.09/MWh, returns a project NPV of €18.24 M, an IRR of 9.15% above the WACC of 5.40% and an LCOE of €33.6/MWh. The investment is recovered in just under eleven years, and the plant avoids the emission of 1.13 million tonnes of CO₂ over its operational lifetime. | en-GB |
| dc.format.mimetype | application/pdf | es_ES |
| dc.language.iso | es-ES | es_ES |
| dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
| dc.subject.other | KTI-electricidad (GITI-E) | es_ES |
| dc.title | DISEÑO Y ESTUDIO DE VIABILIDAD DE UN PARQUE SOLAR FOTOVOLTAICO DE 65MW EN MONTEQUINTO, SEVILLA | es_ES |
| dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
| dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
| dc.keywords | Planta solar fotovoltaica, gran escala, energía renovable, viabilidad | es-ES |
| dc.keywords | Photovoltaic solar plant, large-scale, renewable energy, feasibility | en-GB |
| Aparece en las colecciones: | KTI-Trabajos Fin de Grado | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| TFG Orihuel Ginestar Alicia.pdf | Trabajo Fin de Grado | 10,15 MB | Adobe PDF | Visualizar/Abrir |
| Alicia Anexo I.pdf | Autorización | 350,65 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.