Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/103255
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAlonso Alonso, Consolaciónes-ES
dc.contributor.authorEcheverría Lorente, Domingoes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2025-09-02T07:47:09Z-
dc.date.available2025-09-02T07:47:09Z-
dc.date.issued2026es_ES
dc.identifier.urihttp://hdl.handle.net/11531/103255es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEn el siguiente Trabajo de Fin de Grado se ha realizado un estudio de viabilidad técnica, ambiental y económica de un parque eólico terrestre. A fin de seleccionar el emplazamiento que albergará el parque eólico, se ha realizado una comparación entre tres posibles emplazamientos, comparando las velocidades medias del viento en cada uno de los emplazamientos, su orografía, rugosidad, restricciones ambientales, posibilidad de conexión a la red de transporte y la potencia instalable. Del resultado de esta comparación de emplazamientos, se establece que el emplazamiento seleccionado para albergar el parque eólico por sus condiciones favorables es el situado en la localidad de Bermillo de Sayago, en la provincia de Zamora. Tras la selección del emplazamiento, mediante el empleo de los datos de viento proporcionados por la empresa Vortex, se ha realizado un análisis completo del recurso eólico existente en el terreno empleando programas habituales en el sector como WAsP y Windographer. Mediante el análisis se ha fijado la altura de buje de los aerogeneradores a 150 metros de altura y se ha seleccionado como aerogenerador del parque el Siemens Gamesa SG-170. Se establecen ocho unidades en el terreno, alcanzándose 48,8 MW de potencia instalada. Las simulaciones indican que el parque eólico verterá a la red 153.965,63 MWh/año, con 3.155,03 horas equivalentes y un factor de capacidad del 36,02 %. A su vez, en el proyecto se diseña la obra civil y las instalaciones eléctricas necesarias para la adecuada conexión del parque a la red española. En el estudio económico del proyecto, se muestra que con una inversión necesaria de 61,976 millones de euros, el parque eólico es rentable obteniéndose un VAN positivo, una TIR de 6,8% y un periodo de recuperación inferior a la vida útil del parquees-ES
dc.description.abstractIn this Final Degree Project, a technical, environmental and economic feasibility study of an onshore wind farm has been carried out. In order to select the site that will host the wind farm, a comparison of three possible locations was performed, analyzing the average wind speeds at each site, as well as their orography, terrain roughness, environmental restrictions, connection possibilities to the transmission grid and installable capacity. As a result of this site comparison, the selected location for the wind farm, due to its favorable conditions, is the area located in Bermillo de Sayago, in the province of Zamora. Following the selection of the site, and using the wind data provided by Vortex, a complete analysis of the wind resource available at the location was carried out using software tools commonly employed in the sector, such as WAsP and Windographer. Based on this analysis, the hub height of the wind turbines was set at 150 meters, and the Siemens Gamesa SG-170 was selected as the wind turbine model for the project. Eight units are planned to be installed on the site, reaching a total installed capacity of 48.8 MW. The simulations indicate that the wind farm will export 153,965.63 MWh/year to the grid, with 3,155.03 equivalent full-load hours and a capacity factor of 36.02%. In addition, the project includes the design of the civil works and electrical installations required for the proper connection of the wind farm to the Spanish grid. The economic study of the project shows that, with a required investment of €61.976 million, the wind farm is profitable, obtaining a positive NPV, an IRR of 6.8% and a payback period shorter than the useful life of the wind farm.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleEstudio de viabilidad de un parque eólico terrestre en Bermillo de Sayago (Zamora)es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsParque eólico terrestre, sostenible, aerogenerador, viabilidad económica.es-ES
dc.keywordsOnshore wind farm, sustainable, wind turbine, economic feasibility.en-GB
Aparece en las colecciones: TFG, TFM (temporales)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG-EcheverriaLorente,Domingo.pdfTrabajo Fin de Grado12,99 MBAdobe PDFVisualizar/Abrir
signed_ANEXO I Domingo.pdfAutorización265,07 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.