Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/107250
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorDíaz Pastor, Santos-Josées-ES
dc.contributor.authorPérez Arriaga, José Ignacioes-ES
dc.date.accessioned2025-11-18T08:50:33Z-
dc.date.available2025-11-18T08:50:33Z-
dc.date.issued2025-12-01es_ES
dc.identifier.issn0140-9883es_ES
dc.identifier.urihttps:doi.org10.1016j.eneco.2025.109033es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractAchieving universal electricity access in Uganda requires rethinking the institutional, regulatory, and financial structure of the distribution segment following the end of the Umeme concession. This paper develops and applies an integrated framework that links least-cost electrification planning with cost-reflective revenue requirements, blended capital flows, and internal cross-subsidies.A computational model has been built that simulates the full financial architecture of the power distribution segment, generating annual income statements, balance sheets, and cash flows for each actor. The approach introduces two entities: Service-Co, a publicly supervised and privately operated distribution service company, and Finance-Co, a dedicated vehicle that pools public and private funds including grants, concessional loans, commercial debt, and equity to finance investments across grid and off-grid technologies.Results based on Uganda's National Electrification Strategy show that universal access is achievable without permanent subsidies. Extending the rollout to 2040 reduces annual distribution investment needs by two-thirds and significantly increases returns to both public and private investors. The framework captures the dynamic interaction between tariffs, investment timing, and financing terms, offering a practical tool to design financially robust electrification pathways.This work provides policymakers with a replicable methodology to align access targets with sector solvency. It shows that, when planned and financed as a single system – integrating all electrification modes in a unique technical, regulatory, and financial plan – universal electrification can become a viable long-term investment.es-ES
dc.description.abstractAchieving universal electricity access in Uganda requires rethinking the institutional, regulatory, and financial structure of the distribution segment following the end of the Umeme concession. This paper develops and applies an integrated framework that links least-cost electrification planning with cost-reflective revenue requirements, blended capital flows, and internal cross-subsidies.A computational model has been built that simulates the full financial architecture of the power distribution segment, generating annual income statements, balance sheets, and cash flows for each actor. The approach introduces two entities: Service-Co, a publicly supervised and privately operated distribution service company, and Finance-Co, a dedicated vehicle that pools public and private funds including grants, concessional loans, commercial debt, and equity to finance investments across grid and off-grid technologies.Results based on Uganda's National Electrification Strategy show that universal access is achievable without permanent subsidies. Extending the rollout to 2040 reduces annual distribution investment needs by two-thirds and significantly increases returns to both public and private investors. The framework captures the dynamic interaction between tariffs, investment timing, and financing terms, offering a practical tool to design financially robust electrification pathways.This work provides policymakers with a replicable methodology to align access targets with sector solvency. It shows that, when planned and financed as a single system – integrating all electrification modes in a unique technical, regulatory, and financial plan – universal electrification can become a viable long-term investment.en-GB
dc.format.mimetypeapplication/octet-streames_ES
dc.language.isoen-GBes_ES
dc.sourceRevista: Energy Economics, Periodo: 1, Volumen: online, Número: , Página inicial: 109033-1, Página final: 109033-20es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleAn integrated regulatory–financial proposal for universal electrification in Uganda beyond the Umeme concessiones_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsUniversal electrification;Uganda; Regulation; Public private partnership; Blended financing; Financial model; Sub-Saharan Africaes-ES
dc.keywordsUniversal electrification;Uganda; Regulation; Public private partnership; Blended financing; Financial model; Sub-Saharan Africaen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-25-353R_preview3,76 kBUnknownVisualizar/Abrir
IIT-25-353R_preprint2,4 MBUnknownVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.