Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/10782
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorGalbally, Davides-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2016-07-21T03:05:48Z-
dc.date.available2016-07-21T03:05:48Z-
dc.date.issued2016-10-15es_ES
dc.identifier.issn0360-5442es_ES
dc.identifier.urihttps:doi.org10.1016j.energy.2016.07.014es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractCombined cycle gas turbine power plants (CCGTs) play a key role in modern electric power systems due to their operational flexibility and the firmness they provide to the networks where they operate. Due in part to this flexibility and firmness, the function of CCGTs has experienced a significant evolution with the advent of intermittent renewable energy sources such as wind: CCGTs are increasingly required to rapidly vary load levels in order to counterbalance the fluctuations of renewable energy sources and satisfy overall system demand. The purpose of this paper is to develop a methodology that can be used for assessing the optimal operational strategy of a CCGT when subjected to cycling requirements. This is achieved by introducing a unit commitment formulation that takes into account useful life expenditure costs due to fatigue damage accumulation associated to cycling. The case studies presented in this paper show that neglecting fatigue cycling costs when making operational decisions generates suboptimal cost and profit outcomes for CCGT operators. Furthermore, it is shown that profitability of CCGTs is compromised in systems with very significant penetration of intermittent renewable energy sources, due to the increase in cycling costs derived from continuous load-following operation.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 227, Página final: 247es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleCCGT unit commitment model with first-principle formulation of cycling costs due to fatigue damagees_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsCCGT; Combined cycle plants; Cycling costs; Fatigue damage; Unit commitment model; Wind penetrationen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-16-114A.pdf1,45 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.