Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/11707
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Ramos Galán, Andrés | es-ES |
dc.contributor.author | Rivier Abbad, Michel Luis | es-ES |
dc.contributor.author | García González, Javier | es-ES |
dc.contributor.author | Latorre Canteli, Jesús María | es-ES |
dc.contributor.author | Morales España, German Andres | es-ES |
dc.date.accessioned | 2016-08-26T03:09:11Z | - |
dc.date.available | 2016-08-26T03:09:11Z | - |
dc.date.issued | 2016-06-06 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/11707 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanish hydrothermal system and several cases are analyzed to determine the impact of the time period in the use of the operation reserves. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Instituto de Engenharia de Sistemas e Computadores, Tecnologia e Ciência (Oporto, Portugal) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 13th International Conference on the European Energy Market - EEM16, Página inicial: 1-5, Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Assessment of operation reserves in hydrothermal electric systems with high wind generation | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Mixed-integer programming, operating reserves, unit commitment, economic dispatch, wind power uncertainty. | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-16-042A.pdf | 853,68 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.