Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/14285
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorHuang, Diyunes-ES
dc.contributor.authorde Vos, Kristofes-ES
dc.contributor.authorVan Hertem, Dirkes-ES
dc.contributor.authorOlmos Camacho, Luises-ES
dc.contributor.authorRivier Abbad, Michel Luises-ES
dc.contributor.authorVan der Welle, Adriaanes-ES
dc.contributor.authorSijm, Joses-ES
dc.date.accessioned2016-10-18T12:06:31Z-
dc.date.available2016-10-18T12:06:31Z-
dc.identifier.urihttp://hdl.handle.net/11531/14285-
dc.description.abstractes-ES
dc.description.abstractCross-border transmission network investment requirements are expected to increase, in order to strengthen internal market integration and reach the renewable deployment policy target across Europe. This paper discusses the governance of cross-border transmission network infrastructure using four building blocks: network planning, ownership, financing and cost allocation. Firstly, the key characteristics of current regulatory arrangements and challenges faced are identified for each building block. Options are proposed jointly to address the identified challenges.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleMind the gap: challenges and policy options for cross-border transmission network investmentses_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordscross-border investment; governance policy; transmission networken-GB
Aparece en las colecciones: Documentos de Trabajo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-16-130A.pdf681,67 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.