Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/14285
Título : | Mind the gap: challenges and policy options for cross-border transmission network investments |
Autor : | Huang, Diyun de Vos, Kristof Van Hertem, Dirk Olmos Camacho, Luis Rivier Abbad, Michel Luis Van der Welle, Adriaan Sijm, Jos |
Resumen : | Cross-border transmission network investment requirements are expected to increase, in order to strengthen internal market integration and reach the renewable deployment policy target across Europe. This paper discusses the governance of cross-border transmission network infrastructure using four building blocks: network planning, ownership, financing and cost allocation. Firstly, the key characteristics of current regulatory arrangements and challenges faced are identified for each building block. Options are proposed jointly to address the identified challenges. |
URI : | http://hdl.handle.net/11531/14285 |
Aparece en las colecciones: | Documentos de Trabajo |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-16-130A.pdf | 681,67 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.