Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/24658
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorYuan, Zhaoes-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorHesamzadeh, Mohammad Rezaes-ES
dc.date.accessioned2017-12-21T15:42:46Z-
dc.date.available2017-12-21T15:42:46Z-
dc.date.issued2017-11-01es_ES
dc.identifier.issn0306-2619es_ES
dc.identifier.urihttps:doi.org10.1016j.apenergy.2017.09.086es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe challenge of operating ultra-large-scale power system or super grid is addressed in this paper. We set up the concept of power synergy hub (PSHub) serving as the operation hub coordinating the energy dispatch of multiple nations or regions across the continent to achieve global optimal targets. An eficient mechanism based on the modified Benders decomposition (BD) is proposed to coordinate the operations of national or regional power networks. The key contribution is that we take the total power outputs of regional power networks as the complicating variables to formulate the master problem and subproblems in the modified BD. Instead of using DC optimal power ow model (DC OPF), we propose to use convex AC optimalpower ow model based on second-order cone programming (SOC-ACOPF) to operate the super grid. A comprehensive investigation proves that the SOC-ACOPF outperforms DC OPF in terms of accuracy. Numerical evaluations also show that our SOC-ACOPF model has stronger convergence capability and computational eficiency over other considered SOC-ACOPF models. The convergence of the modified BD is guaranteed by the convexity of SOC-ACOPF. A parallel computation framework in GAMS is proposed to assist real-time operation of the super grid. Compared with operating super grid in a centralized way, the modified BD approach shows stronger convergence capability, computational eficiency and robustness.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Applied Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 1419, Página final: 1434es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleTowards the Power Synergy Hub (PSHub): coordinating the energy dispatch of super grid by modified Benders decompositiones_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsSuper Grid, Power Synergy Hub, Energy Dispatch, Optimal Power Flow, Modified Benders Decomposition, Parallel Computation.en-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-17-152A.pdf2,46 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.