Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/24704
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Campos Fernández, Francisco Alberto | es-ES |
dc.contributor.author | Doménech Martínez, Salvador | es-ES |
dc.contributor.author | Villar Collado, José | es-ES |
dc.date.accessioned | 2017-12-21T15:52:45Z | - |
dc.date.available | 2017-12-21T15:52:45Z | - |
dc.date.issued | 2017-06-06 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/24704 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | Secondary Reserve Requirements (SRR) are usually estimated based upon unit failure rates, and demand and intermittent productions forecasting errors. These requirements are very often inputs to energy and reserve generation dispatch models. However, for the long term, the fact that renewable generation investments must also be computed, affects these requirements. This paper proposes a new Unit Commitment (UC) to represent the SRR in long-term electricity generation models as a function of the renewable investment decisions. Specifically, SRRs are computed as a function of the forecasting errors of renewable productions, and of the unavailability rates of the generation units, which are also outputs of the UC. The case studies show that, when SRRs are endogenous, investments in renewable generation can be lower than expected due to the additional reserve costs these technologies involve. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Technische Universität Dresden (Dresde, Alemania) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 14th International Conference on the European Energy Market - EEM17, Página inicial: 1-5, Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Endogenous secondary reserves requirements in long-term electricity generation models | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | ancillary services, reserve estimation, intermittent generation forecasting, unit commitment, investment decisions. | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-17-061A.pdf | 291,16 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.