Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/32438
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorMastropietro, Paoloes-ES
dc.contributor.authorFontini, Fulvioes-ES
dc.contributor.authorRodilla Rodríguez, Pabloes-ES
dc.contributor.authorBatlle López, Carloses-ES
dc.date.accessioned2018-10-10T03:13:00Z-
dc.date.available2018-10-10T03:13:00Z-
dc.date.issued2018-12-01es_ES
dc.identifier.issn0301-4215es_ES
dc.identifier.urihttps://doi.org/10.1016/j.enpol.2018.09.020es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractItaly is currently implementing a Capacity Remuneration Mechanism (CRM) in a power sector that is paradoxically characterised, at least for the time being, by a significant overcapacity. This article aims at building a critical review of the Italian CRM design. It first presents the Italian context, explaining how the discussion started more than a decade ago and how it evolved since then. Then, it provides an in-depth description and critical analysis of the mechanism under proposal, based on its main design elements, keeping always as a reference the guidelines issued by the European Commission on CRMs. Many valuable lessons can be extracted from the Italian experience to shed light on other similar processes currently under development.es-ES
dc.description.abstractItaly is currently implementing a Capacity Remuneration Mechanism (CRM) in a power sector that is paradoxically characterised, at least for the time being, by a significant overcapacity. This article aims at building a critical review of the Italian CRM design. It first presents the Italian context, explaining how the discussion started more than a decade ago and how it evolved since then. Then, it provides an in-depth description and critical analysis of the mechanism under proposal, based on its main design elements, keeping always as a reference the guidelines issued by the European Commission on CRMs. Many valuable lessons can be extracted from the Italian experience to shed light on other similar processes currently under development.en-GB
dc.format.mimetypeapplication/octet-streames_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy Policy, Periodo: 1, Volumen: online, Número: , Página inicial: 659, Página final: 669es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleThe Italian capacity remuneration mechanism: critical review and open questionses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsCapacity remuneration mechanisms; System adequacy; Flexibility; Reliability options; Design elements; Italyes-ES
dc.keywordsCapacity remuneration mechanisms; System adequacy; Flexibility; Reliability options; Design elements; Italyen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-17-034A.pdf1,22 MBAdobe PDFVisualizar/Abrir     Request a copy
IIT-17-034A_preview2,62 kBUnknownVisualizar/Abrir
IIT-17-034A_preview2,62 kBUnknownVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.