Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/40651
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | González Romero, Isaac Camilo | es-ES |
dc.contributor.author | Wogrin, Sonja | es-ES |
dc.contributor.author | Gómez San Román, Tomás | es-ES |
dc.date.accessioned | 2019-09-11T03:17:50Z | - |
dc.date.available | 2019-09-11T03:17:50Z | - |
dc.date.issued | 2019-09-26 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/40651 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | Under the current European market environment, transmission companies have to decide network expansion by maximizing social welfare. However, generation companies (GENCOs) decide their capacity expansion with the aim of maximizing their own profit. This process, in addition to the increasing penetration of renewable energy, storage and distributed generation, might represent a rupture between short and long-term signals. Therefore, this paper proposes a bi-level formulation for the generation and transmission coordination problem (GEPTEP). We consider a proactive framework in which a centralized TSO represents the upper level while the decentralized GENCOs, that trade in the market, represent the lower level. A case study is presented to evaluate different policy planning objectives. Additionally, the planning results of the bilevel framework (considering both perfect competition and Cournot oligopoly in the lower level) are compared with a traditional cost minimization framework. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Universidade do Porto; Instituto de Engenharia de Sistemas e Computadores, Tecnologia e Ciência (Oporto, Portugal) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 2nd International Conference on Smart Energy Systems and Technologies - SEST 2019, Página inicial: 1-6, Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | What is the cost of disregarding market feedback in transmission expansion planning? | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | GEP, TEP, co-planning, Cournot, proactive | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-19-073A.pdf | 393,95 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.