Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/43571
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorSaboya Bautista, Inmaculadaes-ES
dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.contributor.authorEgido Cortés, Ignacioes-ES
dc.contributor.authorSigrist, Lukases-ES
dc.date.accessioned2019-11-27T04:15:23Z-
dc.date.available2019-11-27T04:15:23Z-
dc.date.issued2020-02-01es_ES
dc.identifier.issn0142-0615es_ES
dc.identifier.urihttps:doi.org10.1016j.ijepes.2019.105412es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThis paper proposes a set of different alternatives of machine learning based algorithms (MLBA) - based on decision trees, neural networks and clustering techniques - to start up multiple rapid start units in AGC operation of power systems. MBLA predict at each instant if the AGC area will fulfil AGC requirements to decide whether RS units should be connected. The operation costs of the RS units (RSOC), the non-compliance time (NCT) of the control area and the non-served secondary energy of the control area (NSSE), are used as key performance indexes of each MLBA. A complete methodology is developed to choose the best algorithm to be employed by a real AGC regulating zone, comprising three steps: (a) an AGC simulation model of the regulating area to test each MLBA, (b) an optimization model to compute a reference of the ideal start-ups of the RS units under perfect information of the regulating area requirements and (c) a normalization process to monetarize NCT and NSSE. The description and tuning of the algorithms to start up multiple RS units, together with the selection and comparison methodology, will be shown for a real secondary regulation zone corresponding to an important generation company of the Spanish power system.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: International Journal of Electrical Power & Energy Systems, Periodo: 1, Volumen: online, Número: , Página inicial: 105412-1, Página final: 105412-8es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleMachine learning based algorithms to dispatch multiple rapid-start units in AGC of power systemses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsen-GB
dc.identifier.doi10.1016/j.ijepes.2019.105412es_ES
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-19-077A.pdf1,58 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.