Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/43591
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorChazarra Jover, Manueles-ES
dc.contributor.authorPérez-Díaz, Juan I.es-ES
dc.contributor.authorGarcía González, Javieres-ES
dc.contributor.authorHelseth, Arildes-ES
dc.date.accessioned2019-11-27T04:17:21Z-
dc.date.available2019-11-27T04:17:21Z-
dc.date.issued2019-09-01es_ES
dc.identifier.issn0378-7796es_ES
dc.identifier.urihttps:doi.org10.1016j.epsr.2019.04.028es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe economic effects of forecasting inaccuracies in the automatic frequency restoration service is analyzed in the context of the operation of a closed-loop and daily-cycle pumped-storage hydropower plant. The uncertainties when scheduling the automatic frequency restoration service are composed by the residual demand curves of the day-ahead reserve market, the upward and downward energy prices due to the activation of the reserves, and the percentages of the upward and downward real-time use of the committed reserves. The plant participates in the day-ahead energy market as a price-taker and in the reserve market as a price-maker, in the context of the Iberian electricity system. In addition, the energy due to the real-time use of the committed reserves is also considered. Results show that the profit is significantly more sensitive to forecast inaccuracies of the day-ahead energy market prices than of the prices and real-time use of reserves from the automatic frequency restoration service.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Electric Power Systems Research, Periodo: 1, Volumen: online, Número: , Página inicial: 105850-1, Página final: 105850-9es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleEconomic effects of forecasting inaccuracies in the automatic frequency restoration service for the day-ahead energy and reserve scheduling of pumped storage plantses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsPumped-storage plant; Automatic frequency restoration service; Residual reserve curve forecasting; Real-time use of reserves; Value of perfect Informationen-GB
dc.identifier.doi10.1016/j.epsr.2019.04.028es_ES
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-19-053A.pdf1,49 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.