Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/43955
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorDoenges, Kaies-ES
dc.contributor.authorEgido Cortés, Ignacioes-ES
dc.contributor.authorSigrist, Lukases-ES
dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.contributor.authorRouco Rodríguez, Luises-ES
dc.date.accessioned2019-12-23T04:12:39Z-
dc.date.available2019-12-23T04:12:39Z-
dc.date.issued2020-07-01es_ES
dc.identifier.issn0885-8950es_ES
dc.identifier.urihttps:doi.org10.1109TPWRS.2019.2960450es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractWith the steady expansion of renewable energy sources (RES), the provision of ancillary services is becoming an increasingly challenging task within system operation. In order to add regulation capacity, battery energy storage systems (BESS) have been recognized as an efficient tool in recent literature. In this context, this paper proposes a novel BESS control strategy to improve dynamic performance of automatic generation control (AGC). Such control strategy is applicable to power systems which evaluate AGC performance utilizing regulation response accuracy margins, which typically define the slowest and fastest permitted power response to a regulation signal. The primary goal consists in enhancing the regulation service by minimizing the rate of non-compliance with respect to the corresponding dynamic performance criteria and its defined accuracy margins. Additionally a comprehensive State-of-Charge-control (SoC-control) is included in the strategy. By utilizing the BESS only during designated regulation assistance periods, preventing extreme levels of charge and furthermore identifying and avoiding futile regulation efforts, BESS degradation is kept to a minimum. To verify effectiveness a case study is conducted with 400 hours of real AGC operation of various BESS sizes. The obtained results show that a BESS is able to minimize the rate of non-compliance considerably, whilst preserving low BESS usage and degradation.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 4, Página inicial: 2816, Página final: 2825es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleImproving AGC performance in power systems with regulation response accuracy margins using Battery Energy Storage System (BESS)es_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsSecondary frequency regulation, Automatic Generation Control, Regulation performance, Battery Energy Storage System, State of Charge, Throughput.en-GB
dc.identifier.doi10.1109/TPWRS.2019.2960450es_ES
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-19-132A.pdf1,48 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.