Título : Distribution planning with reliability options for distributed generation
Autor : Trebolle Trebolle, David
Gómez San Román, Tomás
Cossent Arín, Rafael
Frías Marín, Pablo
Fecha de publicación : 1-feb-2010
Resumen : The promotion of electricity generation from renewable energy sources (RES) and combined heat and power (CHP) has resulted in increasing penetration levels of distributed generation (DG). However, large-scale connection of DG involves profound changes in the operation and planning of electricity distribution networks. Distribution System Operators (DSOs) play a key role since these agents have to provide flexibility to their networks in order to integrate DG. Article 14.7 of EU Electricity Directive states that DSOs should consider DG as an alternative to new network investments. This is a challenging task, particularly under the current regulatory framework where DSOs must be legally and functionally unbundled from other activities in the electricity sector. This paper proposes a market mechanism, referred to as reliability options for distributed generation (RODG), which provides DSOs with an alternative to the investment in new distribution facilities. The mechanism proposed allocates the firm capacity required to DG embedded in the distribution network through a competitive auction. Additionally, RODG make DG partly responsible for reliability and provide DG with incentives for a more efficient operation taking into account the network conditions.
The promotion of electricity generation from renewable energy sources (RES) and combined heat and power (CHP) has resulted in increasing penetration levels of distributed generation (DG). However, large-scale connection of DG involves profound changes in the operation and planning of electricity distribution networks. Distribution System Operators (DSOs) play a key role since these agents have to provide flexibility to their networks in order to integrate DG. Article 14.7 of EU Electricity Directive states that DSOs should consider DG as an alternative to new network investments. This is a challenging task, particularly under the current regulatory framework where DSOs must be legally and functionally unbundled from other activities in the electricity sector. This paper proposes a market mechanism, referred to as reliability options for distributed generation (RODG), which provides DSOs with an alternative to the investment in new distribution facilities. The mechanism proposed allocates the firm capacity required to DG embedded in the distribution network through a competitive auction. Additionally, RODG make DG partly responsible for reliability and provide DG with incentives for a more efficient operation taking into account the network conditions.
Descripción : Artículos en revistas
URI : https://doi.org/10.1016/j.epsr.2009.09.004
ISSN : 0378-7796
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-10-004A.pdf873,1 kBAdobe PDFVisualizar/Abrir     Request a copy
IIT-10-004A_preview2,93 kBUnknownVisualizar/Abrir
IIT-10-004A_preview.pdf2,93 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.