Título : Evaluation of three methods proposed for the computation of inter-TSO payments in the Internal Electricity Market of the European Union
Autor : Olmos Camacho, Luis
Pérez Arriaga, José Ignacio
Fecha de publicación : 1-nov-2007
Resumen : Parties to the Internal Electricity Market of the European Union (IEM) decided in 2001 to abolish the method of pancaking of transmission tariffs for cross-border transactions that was originally in place. Instead, they have agreed to implement a system whereby national transmission tariffs provide access to the entire IEM. This system is supplemented by a scheme of inter-TSO payments. However, conflict may arise if the compensation that a country must pay another one is not in accordance with the electrical usage that the former is making of the grid of the latter. For instance, Inter TSO Compensation methods (ITC methods) implicitly allocate the cost of any existing or new transmission line. Therefore, the adoption of an inefficient method may be an obstacle for building some needed regional grid investments. Consequently, one should give careful consideration to the selection of the ITC method. This paper analyzes, both qualitatively and quantitatively, the implementation of the most relevant ITC methods that have been considered so far in the European debate. When assessing each method from a conceptual point of view, considerable attention is devoted to the critical examination of its main underlying assumptions.
Parties to the Internal Electricity Market of the European Union (IEM) decided in 2001 to abolish the method of pancaking of transmission tariffs for cross-border transactions that was originally in place. Instead, they have agreed to implement a system whereby national transmission tariffs provide access to the entire IEM. This system is supplemented by a scheme of inter-TSO payments. However, conflict may arise if the compensation that a country must pay another one is not in accordance with the electrical usage that the former is making of the grid of the latter. For instance, Inter TSO Compensation methods (ITC methods) implicitly allocate the cost of any existing or new transmission line. Therefore, the adoption of an inefficient method may be an obstacle for building some needed regional grid investments. Consequently, one should give careful consideration to the selection of the ITC method. This paper analyzes, both qualitatively and quantitatively, the implementation of the most relevant ITC methods that have been considered so far in the European debate. When assessing each method from a conceptual point of view, considerable attention is devoted to the critical examination of its main underlying assumptions.
Descripción : Artículos en revistas
URI : https://doi.org/10.1109/TPWRS.2007.907118
ISSN : 0885-8950
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-07-067A.pdf843,23 kBAdobe PDFVisualizar/Abrir     Request a copy
IIT-07-067A_preview2,98 kBUnknownVisualizar/Abrir
IIT-07-067A_preview.pdf2,98 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.