Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/5273
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorBatlle López, Carloses-ES
dc.contributor.authorVázquez Martínez, Carloses-ES
dc.contributor.authorRivier Abbad, Michel Luises-ES
dc.contributor.authorPérez Arriaga, José Ignacioes-ES
dc.date.accessioned2016-01-15T11:19:11Z-
dc.date.available2016-01-15T11:19:11Z-
dc.date.issued2007-09-01es_ES
dc.identifier.issn0301-4215es_ES
dc.identifier.urihttps://doi.org/10.1016/j.enpol.2007.04.002es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractThere has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand.es-ES
dc.description.abstractThere has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy Policy, Periodo: 1, Volumen: online, Número: 9, Página inicial: 4545, Página final: 4554es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleEnhancing power supply adequacy in Spain: Migrating from capacity payments to reliability optionses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsElectricity restructuring; Electricity markets regulation; Security of supplyes-ES
dc.keywordsElectricity restructuring; Electricity markets regulation; Security of supplyen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-07-035A.pdf157,79 kBAdobe PDFVisualizar/Abrir     Request a copy
IIT-07-035A_preview2,72 kBUnknownVisualizar/Abrir
IIT-07-035A_preview.pdf2,72 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.