Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5273
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Batlle López, Carlos | es-ES |
dc.contributor.author | Vázquez Martínez, Carlos | es-ES |
dc.contributor.author | Rivier Abbad, Michel Luis | es-ES |
dc.contributor.author | Pérez Arriaga, José Ignacio | es-ES |
dc.date.accessioned | 2016-01-15T11:19:11Z | - |
dc.date.available | 2016-01-15T11:19:11Z | - |
dc.date.issued | 2007-09-01 | es_ES |
dc.identifier.issn | 0301-4215 | es_ES |
dc.identifier.uri | https:doi.org10.1016j.enpol.2007.04.002 | es_ES |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | There has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: Energy Policy, Periodo: 1, Volumen: online, Número: 9, Página inicial: 4545, Página final: 4554 | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Electricity restructuring; Electricity markets regulation; Security of supply | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-07-035A.pdf | 157,79 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.