Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5280
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Lobato Miguélez, Enrique | es-ES |
dc.contributor.author | Echavarren Cerezo, Francisco | es-ES |
dc.contributor.author | Rouco Rodríguez, Luis | es-ES |
dc.contributor.author | Ugedo Álvarez-Ossorio, Alejandro | es-ES |
dc.date.accessioned | 2016-01-15T11:19:15Z | - |
dc.date.available | 2016-01-15T11:19:15Z | - |
dc.date.issued | 2007-06-01 | es_ES |
dc.identifier.issn | 1913-133X | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/5280 | - |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | Static security assessment within a power system requires:(a) building a scenario of the power system network that represents the state of the network for a particular time spot and (b) running a number of static security assessment tools that could be very time consuming. Short term forecasting of power system scenarios is required to foresee potential network problems and anticipate preventive or corrective measures to be taken under credible contingencies, thus increasing the reliability of the operation of the grid. The aim of this paper is to predict the values of switched shunt devices, i.e., reactors and capacitors in a short-term time scope (24 -36 hours ahead) in order to build a power system scenario. A methodology based on decision trees is proposed and its performance is validated by forecasting the reactive output of the shunt components of the Spanish power system. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: International Journal of Innovations in Energy Systems and Power, Periodo: 1, Volumen: online, Número: 1, Página inicial: 6, Página final: 12 | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Decision trees applied to forecasting switched shunt devices within the Spanish power system | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Power system operation, security assessment, artificial intelligence, decision trees | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-07-027A.pdf | 2,64 MB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.