Título : Impact of distributed generation on distribution investment deferral
Autor : Méndez Quezada, Víctor Hugo
Rivier Abbad, Juan Martín
Fuente León, José Ignacio de la
Gómez San Román, Tomás
Arceluz Ogando, José
Marín, Javier
Madurga, A.
Fecha de publicación : 1-may-2006
Resumen : 
The amount of distributed generation (DG) is increasing worldwide, and it is foreseen that in the future it will play an important role in electrical energy systems. DG is located in distribution networks close to consumers or even in the consumers’ side of the meter. Therefore, the net demand to be supplied through transmission and distribution networks may decrease, allowing to postpone reinforcement of existing networks. This paper proposes a method to assess the impact of DG on distribution networks investment deferral in the long-term. Due to the randomness of the variables that have an impact on such matter (load demand patterns, DG hourly energy production, DG availability, etc.), a probabilistic approach using a Monte Carlo simulation is adopted. Several scenarios characterized by different DG penetration and concentration levels, and DG technology mixes, are analyzed. Results show that, once initial network reinforcements for DG connection have been accomplished, in the medium and long-term DG can defer feeder andor transformer reinforcements.
Descripción : Artículos en revistas
URI : https:doi.org10.1016j.ijepes.2005.11.016
ISSN : 0142-0615
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-06-017A.pdf145,66 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.