Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/5342
Título : Decision trees applied to the management of voltage constraints in the Spanish market
Autor : Ugedo Álvarez-Ossorio, Alejandro
Lobato Miguélez, Enrique
Peco González, Jesús Pascual
Rouco Rodríguez, Luis
Fecha de publicación : 1-may-2005
Resumen : 
The security criteria of a power system require that branch power flows and bus voltages are within their limits, not only in normal operating conditions but also when any credible contingency occurs. In the Spanish electricity market, voltage constraints are solved by connecting a set of offline generators located in the areas where they occur. Thus, for a market participant it is necessary to predict approximately when its generating units are connected in order to prepare the annual budget andor decide the time and location of new plants. This paper proposes a methodology based on decision trees to estimate the daily load pattern of units that have not been cleared in the daily energy market and can be connected to alleviate the network constraints in the Spanish power system. The method explains the behavior of the daily load patterns of a nonconnected unit (obtained through clustering techniques) with a set of explanatory variables. The explanatory variables consist of the demand-generation imbalance in the electrical area of the generating unit and the maintenance scheduling of the transmission lines that feed the area. The method proposed is illustrated with a case study.
Descripción : Artículos en revistas
URI : https:doi.org10.1109TPWRS.2005.846085
ISSN : 0885-8950
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-04-032A.pdf1,05 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.