Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5403Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.author | Muñoz Moro, Lucía | es-ES |
| dc.contributor.author | Ramos Galán, Andrés | es-ES |
| dc.date.accessioned | 2016-01-15T11:20:20Z | - |
| dc.date.available | 2016-01-15T11:20:20Z | - |
| dc.date.issued | 1999-08-01 | es_ES |
| dc.identifier.issn | 0885-8950 | es_ES |
| dc.identifier.uri | https://doi.org/10.1109/59.780915 | es_ES |
| dc.description | Artículos en revistas | es_ES |
| dc.description.abstract | This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology | es-ES |
| dc.description.abstract | This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology | en-GB |
| dc.format.mimetype | application/pdf | es_ES |
| dc.language.iso | en-GB | es_ES |
| dc.rights | es_ES | |
| dc.rights.uri | es_ES | |
| dc.source | Revista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 3, Página inicial: 1021, Página final: 1027 | es_ES |
| dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
| dc.title | Goal programming approach to maintenance scheduling of generating units in large scale power systems | es_ES |
| dc.type | info:eu-repo/semantics/article | es_ES |
| dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
| dc.rights.holder | es_ES | |
| dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
| dc.keywords | integer programming maintenance engineering power generation planning scheduling thermal power stations | es-ES |
| dc.keywords | integer programming maintenance engineering power generation planning scheduling thermal power stations | en-GB |
| Aparece en las colecciones: | Artículos | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| IIT-99-103A.pdf | 682,68 kB | Adobe PDF | Visualizar/Abrir Request a copy | |
| IIT-99-103A_preview | 2,5 kB | Unknown | Visualizar/Abrir | |
| IIT-99-103A_preview.pdf | 2,5 kB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.