Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5544
Título : | Long term maintenance optimization of CCGT plants |
Autor : | Lobato Miguélez, Enrique Sánchez Martín, Pedro Saiz Marín, Elena |
Fecha de publicación : | 20-sep-2012 |
Editorial : | Sin editorial (Shanghai, China) |
Resumen : | The rising share of renewable energies within the generation mix has reduced the load factor of actual CCGT power plants. In this way, a more flexible operation of this technology with an increased number of annual start-up cycles is needed. Since CCGT design assumed a base load operation at nominal power with a few number of annual start cycles, plant owners have to face higher maintenance costs, reliability reduction and lower market incomes. This paper presents a mixed-integer optimization model that schedules the long term maintenance planning based on the daily operation of a CCGT plant in order to maximize its global profit. The model is illustrated with an actual CCGT plant operating in the Spanish power system. |
Descripción : | Capítulos en libros |
URI : | http://hdl.handle.net/11531/5544 |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-12-029A.pdf | 253,03 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.