Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/5544
Título : Long term maintenance optimization of CCGT plants
Autor : Lobato Miguélez, Enrique
Sánchez Martín, Pedro
Saiz Marín, Elena
Fecha de publicación : 20-sep-2012
Editorial : Sin editorial (Shanghai, China)
Resumen : 
The rising share of renewable energies within the generation mix has reduced the load factor of actual CCGT power plants. In this way, a more flexible operation of this technology with an increased number of annual start-up cycles is needed. Since CCGT design assumed a base load operation at nominal power with a few number of annual start cycles, plant owners have to face higher maintenance costs, reliability reduction and lower market incomes. This paper presents a mixed-integer optimization model that schedules the long term maintenance planning based on the daily operation of a CCGT plant in order to maximize its global profit. The model is illustrated with an actual CCGT plant operating in the Spanish power system.
Descripción : Capítulos en libros
URI : http://hdl.handle.net/11531/5544
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-12-029A.pdf253,03 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.