Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/5678
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorCampos Fernández, Francisco Albertoes-ES
dc.contributor.authorVillar Collado, Josées-ES
dc.date.accessioned2016-01-15T11:28:03Z-
dc.date.available2016-01-15T11:28:03Z-
dc.date.issued2004-09-01es_ES
dc.identifier.urihttp://hdl.handle.net/11531/5678-
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractAs it is well known, generation plants availability has a significant impact on the total energy production injected into a power system. This means that a sensible generating system model should be able to represent the availability uncertainty to obtain better solutions than deterministic approaches. In this paper possibility distributions have been used to model the uncertainty of the generation plants availability, when forced outages are presented during their operation. To solve the new possibilistic formulation that results, the main resolution approaches in the literature have been applied, leading always to equivalent but larger crisp systems that can be solved with commercial resolution softwares. A real case study of the current Spanish electricity market is used to analyze the main differences of these approaches on the total generated power and profits.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherSin editorial (Oviedo, España)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 2nd International Conference on Soft Methods in Probability and Statistics - SMPS'2004, Página inicial: 685-692, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleMedium-Term electricity generation with fuzzy availabilityes_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsPlant availability, installed capacity, power system reliability, electricity market, fuzzy constraints, fuzzy programming, possibility theoryen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-04-011A.pdf243,97 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.