Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5710
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Franco Ugidos, Álvaro | es-ES |
dc.contributor.author | Lobato Miguélez, Enrique | es-ES |
dc.contributor.author | Rouco Rodríguez, Luis | es-ES |
dc.contributor.author | Ugedo Álvarez-Ossorio, Alejandro | es-ES |
dc.contributor.author | Fernández Caro, Joaquín | es-ES |
dc.contributor.author | de Benito, Julián | es-ES |
dc.contributor.author | Chofre Álvarez, Javier | es-ES |
dc.contributor.author | de La Hoz Ardiz, Jorge | es-ES |
dc.date.accessioned | 2016-01-15T11:28:20Z | - |
dc.date.available | 2016-01-15T11:28:20Z | - |
dc.date.issued | 2003-06-23 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/5710 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | The Spanish electricity business, deregulated since January 1st 1998, has been organized in two different types of markets: (a) the energy markets (which include the day-ahead electricity market and 6 intradaily markets) and (b) the ancillary services markets (comprising the secondary and tertiary reserve markets and the deviation management markets). A generating firm must decide the generation resources to be distributed within each of the mentioned markets. This paper proposes a stochastic optimization model that decides the amount of resources to be distributed by a price-taker generating firm in each market of the generation business. The objective function maximizes the agent expected total profit. In addition, the model obtains the bid curves of the firm to be submitted to the hourly periods of each market. A case study illustrates the performance of the model proposed. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Sin editorial (Bolonia, Italia) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 2003 IEEE Power Tech Conference Proceedings, Página inicial: , Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Optimization of the Spanish market sequence by a price-taker generating firm | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Generation scheduling, competitive electricity market, bidding strategies. | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-03-046A.pdf | 498,65 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.