Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5726
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Ventosa Rodríguez, Mariano | es-ES |
dc.contributor.author | Denis Corrales, Rafael | es-ES |
dc.contributor.author | Redondo, C. | es-ES |
dc.date.accessioned | 2016-01-15T11:28:28Z | - |
dc.date.available | 2016-01-15T11:28:28Z | - |
dc.date.issued | 2002-06-24 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/5726 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | This paper presents two different approaches to model expansion planning in electricity markets under imperfect competitive conditions. Both approaches ocnsider a market in which firms compete in quantity as in the Nash-Cournot game. However, the two models differ from each other in how earch firm makes its expansion-planning decisions. In the first model, the key assumption that permits its formulation as a Mixed Linead Complementarity Problem (LCP) is that firms not only decide their output in a Cournot manner but also their new generating capacity. In contrast, in the second model, there is a leader firm that anticipates the reaction of the follower firms as in the Stackelberg game. The latter model is formulated as a Mathematical Program with Equilibriun Constraints (MPE), wherein the leader firm decides its optimal new capacity subject to a set of market equilibrium constraints. Both models have been implemented in GAMS. A simple example is also presented to illustrate their comparison and application. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Sin editorial (Sevilla, España) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 14th Power systems computation conference Session 43-4, pp. 1-8 - PSCC'02 , Página inicial: , Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Expansion Planning in Electricity Markets. Two different approaches Proceedings | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Complementarity problem, nash-cournot, mathematical programming with equilibrium constraints, stackelberg | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-02-068A.pdf | 305,56 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.