Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/60421
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorCenteno Hernáez, Efraimes-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.date.accessioned2021-09-01T03:07:19Z-
dc.date.available2021-09-01T03:07:19Z-
dc.date.issued2021-07-29es_ES
dc.identifier.urihttp://hdl.handle.net/11531/60421-
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractInvestment costs are significantly decreasing along the years for some electricity generation technologies (such as wind or solar), making them an attractive option for generation capacity expansion. Nevertheless, most of the available capacity expansion models, either minimizing cost or maximizing profit, annualize investment costs exogenously (usually distributing them uniformly along the plant life span) or consider overall investment costs, but without an adequate representation of residual value. Both approaches are misleading if investment cost decrease along the years. This paper introduces a cost minimization model for ca-pacity expansion planning that considers overall investment costs, with a coherent representation of the residual value. This method-ology distributes endogenously the cost recovery along the years, in an optimal way. The presented case study results indicate that uniform annualization may misestimate optimal investment and it is not the most adequate option in this context. This approach opens the possibility of a deeper analysis of the optimal recovery cost path, improving planning of any electrical assets in minimiza-tion-cost planning models or market-equilibrium-based ones.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherInstitute of Electrical and Electronics Engineers Power and Energy Society; Universidad Pontificia C (Madrid, España)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 14th IEEE PowerTech Conference - PowerTech 2021, Página inicial: 1-6, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleAnnualized versus overall investment cost in generation capacity expansion planninges_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordscosting, generation power planningen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-21-038A.pdf414,8 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.