Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/67863
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAlonso del Yerro, Pedroes-ES
dc.contributor.authorFerrer Colomer, Alejandroes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-04-26T10:45:18Z
dc.date.available2022-04-26T10:45:18Z
dc.date.issued2022es_ES
dc.identifier.urihttp://hdl.handle.net/11531/67863
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractTras la aprobación en 2019 del Real Decreto de Autoconsumo 244/2019 del 6 de abril, en 2021 de los fondos “Next Generation” y los precios actuales de la electricidad buscar una alternativa energética para reducir los costes de la factura de la luz está a la orden del día. Si a esto se le suma el cambio climático y la transformación que está viviendo el planeta, la mejor opción que satisfaga ambas partes sería una instalación de energía renovable y en concreto se ha elegido una planta solar fotovoltaica destinada al autoconsumo. Esta planta en cuestión será la segunda fase de una planta fotovoltaica existente ubicada en una finca agrícola, la cual pertenece a la empresa Giner Export S.A. y se ubica en el municipio de San Telmo, Huelva. Las placas fotovoltaicas se instalarán sobre unos soportes de hormigón a una inclinación de 20º y 0º respecto el Sur. La planta contará con un total de 612 módulos de 540W cada uno distribuidos en 34 cadenas de 18 módulos cada una y 3 inversores de 100KW. Esto dará un total de 330kWp. Se espera que esta planta genere un total de 587,75MWh haciendo bajar el consumo actual de la finca de 866,1 MWh a 500MWh. El resto serán excedentes, los cuales no se puede verter a la red de momento. Redirigiendo el consumo a las horas de generación se espera que bajen estos excedentes y que genere más beneficios. El presupuesto total será de 231.434,43 € que con una subvención del 20%, (todavía por aprobar, puede variar) daría un TIR del 28% y un VAN del 557.602,15 € siendo amortizada en menos de 3 años.es-ES
dc.description.abstractAfter the approval in 2019 of the Royal Decree of Self-consumption 244/2019 of 6 April, in 2021 of the "Next Generation" funds and the current electricity prices, looking for an energy alternative to reduce the costs of the electricity bill is the order of the day. If we add to this the climate change and the transformation that the planet is undergoing, the best option that satisfies both parties would be a renewable energy installation and, in particular, a solar photovoltaic plant for self-consumption has been chosen. This plant in question will be the second phase of an existing photovoltaic plant located on an agricultural estate, which belongs to the company Giner Export S.A. and is located in the municipality of San Telmo, Huelva. The photovoltaic panels will be installed on concrete supports at an inclination of 20º and 0º to the south. The plant will have a total of 612 modules of 540W each distributed in 34 strings of 18 modules each and 3 inverters of 100KW. This will give a total of 330kWp. This plant is expected to generate a total of 587.75MWh bringing down the farm's current consumption from 866.1 MWh to 500MWh. The rest will be surplus, which cannot be fed into the grid for the time being. By redirecting consumption to generation hours, it is expected to reduce this surplus and generate more profit. The total budget will be 231,434.43 € which with a subsidy of 20%, (still to be approved, it may vary) would give an IRR of 28% and an NPV of 557,602.15 € being amortised in less than 3 years.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3322 Tecnología energéticaes_ES
dc.subject332202 Generación de energíaes_ES
dc.subject.otherKTI-electricidad (GITI-E)es_ES
dc.titleProyecto de ampliación de la planta fotovoltaica existente en la finca agrícola “Montepinos”, sita en El Cerro de Andévalo (HUELVA)es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsAutoconsumo, instalación, solar, planta, generación, consumo, energíaes-ES
dc.keywordsSelf-consumption, installation, solar, plant, generation, consumption, energyen-GB
Aparece en las colecciones: KTI-Trabajos Fin de Grado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFG__Ferrer_Colomer_Alejandro.pdfTrabajo Fin de Grado5,7 MBAdobe PDFVista previa
Visualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.