dc.contributor.authorMorales España, German Andreses-ES
dc.contributor.authorBaldick, Rosses-ES
dc.contributor.authorGarcía González, Javieres-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2016-05-23T03:06:09Z-
dc.date.available2016-05-23T03:06:09Z-
dc.date.issued2016-04-01es_ES
dc.identifier.issn1949-3029es_ES
dc.identifier.urihttps://doi.org/10.1109/TSTE.2015.2498399es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractThis paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal with wind production uncertainty. These power and ramp requirements can be obtained from wind forecast information. The model is formulated as a power-based UC, which schedules power-trajectories instead of the traditional energy-blocks and takes into account the inherent startup and shutdown power trajectories of thermal units. These characteristics allow a correct representation of unit’s ramp schedule which define their ramp availability for reserves. The proposed formulation significantly decreases operation costs compared to traditional deterministic and stochastic UC formulations while simultaneously lowering the computational burden. The operation cost comparison is made through 5-min economic dispatch simulation under hundreds of out-of-sample wind generation scenarios.es-ES
dc.description.abstractThis paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal with wind production uncertainty. These power and ramp requirements can be obtained from wind forecast information. The model is formulated as a power-based UC, which schedules power-trajectories instead of the traditional energy-blocks and takes into account the inherent startup and shutdown power trajectories of thermal units. These characteristics allow a correct representation of unit’s ramp schedule which define their ramp availability for reserves. The proposed formulation significantly decreases operation costs compared to traditional deterministic and stochastic UC formulations while simultaneously lowering the computational burden. The operation cost comparison is made through 5-min economic dispatch simulation under hundreds of out-of-sample wind generation scenarios.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Sustainable Energy, Periodo: 1, Volumen: online, Número: 2, Página inicial: 614, Página final: 624es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titlePower-capacity and ramp-capability reserves for wind integration in power-based UCes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsMixed-integer programming, operating reserves, power-based UC, power-capacity reserves, ramp-capability reserves, unit commitment.es-ES
dc.keywordsMixed-integer programming, operating reserves, power-based UC, power-capacity reserves, ramp-capability reserves, unit commitment.en-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-15-160A.pdf1,28 MBAdobe PDFVisualizar/Abrir     Request a copy
IIT-15-160A_preview2,83 kBUnknownVisualizar/Abrir
IIT-15-160A_preview.pdf2,83 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.