Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/7696| Título : | Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model |
| Autor : | Unsihuay, Clodomiro Marangon Lima, Jose Wanderley Zambroni de Souza, A.C. Pérez Arriaga, José Ignacio |
| Fecha de publicación : | 1-feb-2011 |
| Resumen : | A novel multiobjective, multiarea and multistage model to long-term expansion planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a "bottom-up" energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewables, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The proposed model considers three objectives belonging to sustainable energy development criteria such as: (a) the minimization of investments and operation costs of power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; (b) minimization of Life-Cycle Greenhouse Gas Emissions (GHG); and (c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. A novel multiobjective, multiarea and multistage model to long-term expansion planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a "bottom-up" energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewables, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The proposed model considers three objectives belonging to sustainable energy development criteria such as: (a) the minimization of investments and operation costs of power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; (b) minimization of Life-Cycle Greenhouse Gas Emissions (GHG); and (c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. |
| Descripción : | Artículos en revistas |
| URI : | https://doi.org/10.1016/j.ijepes.2010.08.021 |
| ISSN : | 0142-0615 |
| Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| IIT-11-232A.pdf | 553,8 kB | Adobe PDF | ![]() Visualizar/Abrir Request a copy | |
| IIT-11-232A_preview | 3,3 kB | Unknown | Visualizar/Abrir | |
| IIT-11-232A_preview | 3,3 kB | Unknown | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.
