Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/81117
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorBaringo Morales, Anaes-ES
dc.contributor.authorBaringo Morales, Luises-ES
dc.contributor.authorArroyo, José M.es-ES
dc.date.accessioned2023-07-24T12:14:21Z-
dc.date.available2023-07-24T12:14:21Z-
dc.date.issued2021-11-01es_ES
dc.identifier.issn0142-0615es_ES
dc.identifier.urihttps://doi.org/10.1016/j.ijepes.2021.107081es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstract.es-ES
dc.description.abstractThis paper presents a novel approach for the investment planning of a virtual power plant trading energy in an electricity market. The virtual power plant comprises conventional generating units, renewable generating units, storage units, and a set of flexible demands. In order to maximize its expected profit, the virtual power plant has the possibility of installing new conventional, renewable, and storage units. Such investment decisions are made under the long-term uncertainty associated with future production costs of the conventional generating units, future consumption levels of the flexible demands, and future energy market prices, as well as the short-term variability of market prices and renewable production levels. In addition, the effect of generation and storage operation on investment decisions is precisely characterized by a detailed nonconvex formulation. The resulting model is cast as a scenario-based two-stage stochastic programming problem wherein the conditional value-at-risk is used to represent the risk aversion of the owner of the virtual power plant. Numerical results from several case studies show that the virtual power plant can significantly increase its expected profit by expanding its generation and storage assets. Moreover, neglecting nonconvex operational constraints generally results in over-investment in conventional generating units. The moderate computational effort required to solve instances with up to 45 candidate assets backs the practical applicability of the proposed approach.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: International Journal of Electrical Power and Energy Systems, Periodo: 1, Volumen: 132, Número: 107081, Página inicial: 1, Página final: 15es_ES
dc.titleHolistic planning of a virtual power plant with a nonconvex operational model: A risk-constrained stochastic approaches_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderLa editorial no permite el depósito en abiertoes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywords.es-ES
dc.keywordsCo-optimized generation and storage investment decisionsNonconvex operational modelRiskStochastic programmingVirtual power plant planningen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Tamaño Formato  
202372494952782_1-s2.0-S0142061521003203-main.pdf810,08 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.