Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/85770
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorMorán Río, Diana Patriciaes-ES
dc.contributor.authorRoldán Pérez, Javieres-ES
dc.contributor.authorProdanovic, Milanes-ES
dc.contributor.authorGarcía Cerrada, Aurelioes-ES
dc.date.accessioned2023-12-04T20:43:04Z-
dc.date.available2023-12-04T20:43:04Z-
dc.date.issued2023-06-06es_ES
dc.identifier979-8-3503-4743-2es_ES
dc.identifier.urihttp://hdl.handle.net/11531/85770-
dc.descriptionPresentación en congresoes_ES
dc.description.abstractLas microrredes (MG) se tienen usando para la integración de fuentes de energía renovables (RES) en los sistemas de distribución eléctrica. Estas redes están formadas por una combinación de RES y baterías que pueden funcionar en modo grid-forming o grid-following. En la actualidad, la transición de las microrredes de modo isla a modo conectado a red es un desafío, especialmente si los convertidores grid-forming operan en su punto de máxima potencia. En este artículo se propone un control secundario que facilita la operación suave de convertidores formadores con baterías. Este controlador permite la conexión de cargas y sincronización de la MG con la red principal sin necesidad de alterar la potencia inyectada por algunos convertidores grid-forming (e.g., los que trabajan en su punto de máxima potencia). Para ello, las baterías inyectan la potencia adicional demandada y la comparten entre ellas según su SoC. Los principales desarrollos se prueban utilizando los entornos de simulación Simulink y simPowerSystems.es-ES
dc.description.abstractMicrogrids (MGs) have become a commonly used way for renewable energy sources (RESs) integration in electrical distribution systems. These MGs are formed of a mix of RESs and batteries that can operate either in grid-forming or grid-following control modes. In these new scenarios, the transition from islanded to grid-connected mode is a challenging issue, especially if there are renewable-based grid-forming converters working at their maximum power point. In this paper, a secondary controller that enables the seamless operation of grid-forming converters with batteries is proposed. This controller allows the connection of loads and synchronisation of the MG with the main grid without the need for altering the power injected by some selected grid-forming converters (e.g., those working at their maximum power point). Meanwhile, any additional power demand is met by the batteries and shared between them according to their SoC. The main developments are tested using Simulink and simPowerSystems simulation environments.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceDescripción: 2023 IEEE International Conference on Environment and Electrical Engineering and 2023 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe) Número: - Volumen: - Página Inicio: - Página Fin: -es_ES
dc.titleEnabling the Seamless Coordination and Synchronization of Microgrids using Batterieses_ES
dc.typeinfo:eu-repo/semantics/otheres_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holdercopyright de la revistaes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordsMicrorred, grid-forming, control secundario, sincronización, bateríases-ES
dc.keywordsmicrogrid, grid-forming, secondary controller, synchronisation, batteriesen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Tamaño Formato  
confBESSSync.pdf410,68 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.