Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/87557
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorChaves Ávila, José Pabloes-ES
dc.contributor.authorBáñez Chicharro, Fernandoes-ES
dc.contributor.authorDietrich, Kristines-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2024-03-04T15:40:22Z-
dc.date.available2024-03-04T15:40:22Z-
dc.date.issued2015-10-22es_ES
dc.identifier.urihttp://hdl.handle.net/11531/87557-
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractThis paper discusses the market designs that impact intermittent energy sources (IES) curtailment, such as negative prices, the priority dispatch rule for IES and compensation for IES curtailment. It also describes the approaches applied in some European countries and proposed designs of European institutions. An evaluation of different schemes for IES curtailment is assessed for the Spanish 2020 scenario by using a system operation model. The results show that negative prices and demand response decrease consumers' costs by from 1.54 to 1.6, depending on the curtailment compensation. Without curtailment compensation, existing IES units have similar or higher revenues, in comparison with current priority dispatch. Future installations will face higher curtailments. At the same time, consumers can potentially benefit from lower costs.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherEuropean Wind Energy Association (Bruselas, Bélgica)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 14th International Workshop on Large-scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Power Plants - WIW 2015, Página inicial: , Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleImplications from changing the priority dispatch for intermittent energy sources to a market based approach: application to the Spanish casees_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsintermittent energy sources, market designs, priority dispatch, curtailment compensationen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-15-159A.pdf232,54 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.