Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/88785
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorJiménez Octavio, Jesús Ramónes-ES
dc.contributor.authorPilo De La Fuente, Eduardoes-ES
dc.contributor.authorLópez García, Óscares-ES
dc.contributor.authorCarnicero López, Albertoes-ES
dc.date.accessioned2024-05-31T10:49:08Z-
dc.date.available2024-05-31T10:49:08Z-
dc.date.issued2006-05-22es_ES
dc.identifier.urihttp://hdl.handle.net/11531/88785-
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractThis paper presents a coupled electromechanical optimization of the cost of high speed railway overheads. The proposed electromechanical optimization solves the coupled mechanical and electrical problems by obtaining the railway overhead with minimum cost. A simple model cost of the railway overhead is proposed. This model cost defines the global cost per kilometer, which is mainly composed by the costs of material used in the construction of the overhead supports and the electric lines respectively. Using a standard genetic algorithm the optimized railway overhead is obtained. The parameters which describe the railway overhead are defined by: (i) sizing and (ii) configuration of the overhead supports; (iii) geometric location and (iv) type of electric conductors. The constraints considered are: (i) maximum allowable stress, and (ii) structural static stability; (iii) structure gauge to limit the position of physical conductors, (iv) minimum distance between conductors or between conductor and earth and (v) maximum allowable current of each conductor. In addition, the fitness function also considers the minimization of the equivalent electrical system impedance as a secondary optimization criterion. This optimization method has been successfully applied to the design of the high speed railway overhead C-350, used in the new line Madrid-Barcelona-French Border. The optimized railway overhead shows an overall improvement at two levels. Firstly the performance is enhanced and secondly the global cost is reduced. The obtained results are compared with the non-optimized configuration in order to demonstrate the obtained improvements.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherSin editorial (Atlanta, Estados Unidos de América)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: ASME/IEEE Joint Rail Conference - JRC 2006, Página inicial: 231-240, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleCoupled electromechanical cost optimization of high speed railway overheadses_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsNo disponibleNot availableen-GB
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Tamaño Formato  
IIT-06-122C.pdf5,25 MBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.