Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/93125
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAlonso Alonso, Consolaciónes-ES
dc.contributor.authorCarrodeguas Rodríguez, Albaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-09-05T12:18:06Z-
dc.date.available2024-09-05T12:18:06Z-
dc.date.issued2025es_ES
dc.identifier.urihttp://hdl.handle.net/11531/93125-
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEste proyecto recoge el diseño de un parque eólico en tierra, en concreto en Palencia. Se ha diseñado teniendo en cuenta la selección del emplazamiento, aerogeneradores y tipos de cables. Para ello se ha tenido que estudiar el recurso eólico utilizando el programa Windographer y la estimación de la energía eléctrica producida utilizando WASp. Se integran en el proyecto; memoria descriptiva, planos, cálculos justificativos, presupuesto y viabilidad del proyecto. En una primera fase del proyecto, se evaluaron cuatro alternativas de emplazamiento teniendo en cuenta diferentes criterios. Se seleccionó finalmente el emplazamiento situado en Castilla y León, a 35 km de Palencia, que presentó las mejores condiciones globales. Este lugar, denominado Parque Eólico de Valdegarón, se caracteriza por un terreno llano, buena accesibilidad desde la carretera regional y proximidad a la subestación de Páramo de Sardón (132 kV). Los datos de viento fueron procesados mediante el software Windographer, permitiendo obtener información sobre la velocidad del viento, distribución de Weibull y las rosas de viento. El análisis confirmó una media de 9 m/s a 150 m de altura, con una clara estacionalidad favorable en los meses de invierno. Posteriormente, los datos se integraron en el software WAsP, lo cual permitió estimar la producción energética. Tras simular distintos modelos, se seleccionó el modelo General Electric Cypress 5.8-164 por su mejor rendimiento. Concluido el estudio energético, se abordó el diseño de la obra civil y la infraestructura eléctrica. Se planificaron 3.700 m de caminos reacondicionados, plataformas de montaje, cimentaciones estándar, así como las zanjas eléctricas para media tensión, fibra óptica y tierra. El presupuesto total del parque asciende a 49,17 millones de euros, incluyendo aerogeneradores, obra civil, ingeniería y control. Se evaluaron tres escenarios de ingresos: mercado diario, PPA fijo e indexado. El análisis de flujos de caja mostró que todos los escenarios son viables, siendo el más rentable el PPA indexado.es-ES
dc.description.abstractThis project presents the design of an onshore wind farm located in Palencia, Spain. The design process considered site selection, wind turbines, and cable types. To this end, the wind resource was analyzed using the Windographer software, and energy production was estimated using WAsP. The project includes a descriptive report, layout plans, technical calculations, budget, and feasibility analysis. In the initial phase, four alternative sites were evaluated based on several criteria. The site ultimately selected is located in Castilla y León, 35 km from Palencia, as it offered the best overall conditions. This location, named Valdegarón Wind Farm, features flat terrain, good road access via the regional highway, and proximity to the Páramo de Sardón substation (132 kV). Wind data was processed using Windographer, providing information on wind speed, Weibull distribution, and wind roses. The analysis confirmed an average wind speed of 9 m/s at 150 meters height, with favorable seasonality during the winter months. The data was then integrated into WAsP software to estimate energy production. After simulating several turbine models, the General Electric Cypress 5.8-164 was selected for its superior performance. Following the energy study, the design of the civil works and electrical infrastructure was developed. The plan includes 3,700 meters of refurbished access roads, assembly platforms, standard foundations, and trenches for medium-voltage cables, fiber optics, and grounding. The total budget for the wind farm amounts to €49.17 million, including turbines, civil works, engineering, and monitoring. Three revenue scenarios were assessed: day-ahead market, fixed PPA, and indexed PPA. The cash flow analysis showed all scenarios to be viable, with the indexed PPA proving to be the most profitable.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-electrotecnica (MII-E)es_ES
dc.titleProyecto de un parque eólico en tierra en Españaes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsEnergías renovables, aerogenerador, viabilidad económica, ODSes-ES
dc.keywordsRenewable energy, wind turbine, economic viability, SDGsen-GB
Aparece en las colecciones: H62-Trabajos Fin de Máster

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TFM-CarrodeguasRodriguez,Alba.pdfTrabajo Fin de Máster9,52 MBAdobe PDFVisualizar/Abrir
signed_AnexoI_AlbaCarrodeguas.pdfAutorización138,12 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.